Skip to main content
Back to search resultsBill 020342

Authorizing Drexel University to construct and maintain various encroachments in, on and under the raised triangular area in the public right-of-way within the area bounded by Thirty-second street as it extends north of Market street, Market street and Lancaster avenue and to construct, use and maintain a conduit trench for water service and electric service under the north footway of Market street, Thirty-second street and the raised triangular area, all under certain terms and conditions.

View file history View official file on Legistar →

File details

Status
Enacted
Type
Bill
Introduced
May 16, 2002
Sponsors
CBCouncilmember Blackwell

Full Bill

THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:

SECTION 1. Permission is hereby granted to Drexel University to construct and maintain the following encroachments in, on and under the raised triangular area in the public right-of-way within the area bounded by Thirty-second street as it extends north of Market street, Market street and Lancaster avenue and to construct, use and maintain a conduit trench for water service and electric service under the north footway of Market street, Thirty-second street and the raised triangular area:

(a) granite sign approximately twenty-one feet (21') long, eighteen inches (18") wide and three feet, six inches (3'-6") high. The sign is oriented perpendicular to the Market street curb line within the landscaped portion of the raised triangular area. The south end of the sign is located approximately eighty-two feet (82') north of the south curb line of Market street and approximately fifty-eight feet (58') east of the west curb line of Thirty-second street to the centerline of the sign.

(b) three (3) six-inch (6") diameter flag poles approximately thirty feet (30') high located within the landscaped portion of the raised triangular area. The center line of each flag pole is located fifty-one feet, five inches (51'-5") east of the west curb line of Thirty-second street and at the following offsets north of the south curb line of Market street:

(i) approximately ninety-five feet, ten inches (95'-10")

(ii) approximately one hundred and three feet, ten inches (103'-10")

(iii) approximately one hundred and eleven feet, ten inches (111'-10")

(c) four (4) trees on the raised triangular area

(d) two (2) accessory floodlights located approximately three feet (3') east of the west centerline of the granite sign and approximately eighteen inches (18") north of the south end of the sign.

(e) underground irrigation system within the landscaped portion of the raised triangular area. The irrigation system includes a one-inch (1") PVC pipe connecting eight (8) adjustable sprinkler heads around the perimeter of the triangular planting bed. Each sprinkler head will be a minimum of approximately twelve inches (12") from the paved footway and controlled by an electric water valve.

(f) conduit trench beginning at the property line of 3215 Market street and extending in a southerly direction under the north footway of Market street to a point approximately eighty-eight feet, six inches (88'-6") north of the south curb line of Market street and approximately fifty-five feet (55') west of the west curb line of Thirty-second street. The trench continues easterly under the north footway of Market street, into the cartway of Thirty-second street and into the raised triangular area. The trench continues under the raised triangular area to a point approximately eighty-eight feet, six inches (88'-6") north of the south curb line of Market street and approximately fifty feet, six inches (50'-6") east of the west curb line of Thirty-second street. The ducts placed within the trench will maintain a minimum of approximately three feet (3') of cover in the cartway of Thirty-second street.

(g) one (1) three inch (3") ductile iron conduit containing a one inch (1") PVC pipe for the irrigation system within the landscaped portion of the raised triangular area. The ductile iron conduit will be located in the conduit trench described in Section 1(f).

(h) two (2) four inch (4") diameter cast iron conduits. One (1) conduit will provide the electrical service to the floodlights listed in Section 1(d) and one (1) conduit will be for future use. Both conduits will be located in the conduit trench described in Section 1(f).

SECTION 2. Before exercising any rights or privileges under this Ordinance, Drexel University must first obtain all required permits, licenses and approvals from all appropriate City departments, boards, agencies or commissions. No such department, board, agency or commission shall be required to issue any such permit, license or approval solely because this Ordinance has been enacted, it being the express intent of this Ordinance not to supersede any other provision of law governing the issuance of such permits, licenses or approvals. In addition, before exercising any rights or privileges under this Ordinance, Drexel University shall enter into an agreement ("Agreement") with the appropriate City department(s), in a form satisfactory to the City Solicitor, to provide that Drexel University shall, inter alia:

(a) furnish the City with a bond with corporate surety in the amount required by the Department of Streets and in a form satisfactory to the City Solicitor to insure compliance with all the terms and conditions of this Ordinance and the Agreement;

(b) protect, indemnify and save harmless the City from all suits or claims for damages which may arise directly or indirectly as a result of the encroachments authorized in Section 1 of this Ordinance;

(c) comply with the provisions of The Philadelphia Code, thereby securing all permits, licenses and approvals from all appropriate departments, boards, agencies or commissions as may be required;

(d) insure that the encroachments, conduit trench, water conduit, and two (2) electrical conduits authorized in Section 1 of this Ordinance do not exceed the dimensions specified in Section 1;

(e) carry public liability and property damage insurance co-naming the City of Philadelphia as an insured party in such amounts as shall be satisfactory to the City Solicitor;

(f) remove any or all of the various encroachments in, on or under the public rights-of-way within ninety (90) days upon lawful service of notice from the City of Philadelphia;

(g) remove any encroachment constructed pursuant to the authority of this Ordinance within ninety (90) days after the encroachment is no longer being used for the purpose authorized by the Ordinance.

(h) assume the cost of all changes or adjustments to, or relocation or abandonment of, all utilities, structures and appurtenances within the public right-of-way which are necessary for the installation of the encroachments authorized by Section 1 of this Ordinance; and

(i) provide proof that PECO Energy Company has approved the location, design and connection of the underground electrical line and appurtenances.

SECTION 3. The City Solicitor shall include in the Agreement such other terms and conditions as shall be deemed necessary to protect the interests of the City.

SECTION 4. The permission granted to Drexel University to construct and maintain various encroachments in, on and under the raised triangular area in the public right-of-way within the area bounded by Thirty-second street, as it extends north of Market street, Market street and Lancaster Avenue and to construct, use and maintain a conduit trench for water service and electric service under the north footway of Market street, Thirty-second street and the raised triangular area shall expire without any further action by the City of Philadelphia if Drexel University has not entered into the Agreement and satisfied all requirements of the Agreement and this Ordinance that are listed in Section 2 of the Ordinance within one (1) year after this Ordinance becomes law.

SECTION 5. This Ordinance shall not become effective unless the sum of two hundred dollars ($200.00), toward the costs thereof, is paid into the City Treasury within sixty (60) days after this Ordinance becomes law.

End

|1013|

|1013|

Timeline

File history

A file can move through several public steps, including introduction, hearings, amendments, votes and final action. This timeline puts those events in date order, groups routine entries from the same day, and attaches published member votes to the action they record.

  1. Council ActionMAYOR

    SIGNED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  2. Member voteCITY COUNCIL

    PASSED

    Member-by-member vote published for this action.

    Pass17 Yes · 0 No · 0 AbsentView member votes →
    Official action detail

    A motion was made that this matter be PASSED. The motion carried by the following vote:

    Member votes

    MemberVote
    Angel OrtizYes
    Anna Cibotti VernaYes
    Blondell Reynolds BrownYes
    Brian J. O'NeillYes
    Darrell L. ClarkeYes
    David CohenYes
    Donna Reed MillerYes
    Frank J. DiCiccoYes
    Frank RizzoYes
    James F. KenneyYes
    Jannie L. BlackwellYes
    Joan L. KrajewskiYes
    Marian B. TascoYes
    Michael A. NutterYes
    Rick MarianoYes
    W. Thacher LongstrethYes
    W. Wilson Goode, Jr.Yes

    Source: LegislationDetail.aspx · gridLegislation

    Council ActionCITY COUNCIL

    READ

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  3. 3 procedural actionsCITY COUNCIL
    ProceduralCITY COUNCIL

    ORDERED PLACED ON NEXT WEEK`S SECOND READING CALENDAR

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

    UnanimousCITY COUNCIL

    SUSPEND THE RULES OF THE COUNCIL

    Pass
    Official action detail

    A motion was made by Councilmember DiCicco that this matter be SUSPEND THE RULES OF THE COUNCIL. The motion carried unanimously.

    Source: LegislationDetail.aspx · gridLegislation

    ProceduralCITY COUNCIL

    ORDERED PLACED ON THIS DAY`S FINAL PASSAGE CALENDAR

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  4. 3 procedural actionsCommittee on Streets and Services
    ProceduralCommittee on Streets and Services

    REPORTED FAVORABLY, RULE SUSPENSION REQUESTED

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  5. UnanimousCITY COUNCIL

    Introduced

    Marked unanimous; no member-by-member tally published.

    Pass
    Official action detail

    A motion was made by Councilmember Blackwell that this matter be Introduced. The motion carried unanimously.

    Source: LegislationDetail.aspx · gridLegislation