ADOPTED
Other recorded action without a published tally.
Official action detail
Source: LegislationDetail.aspx · gridLegislation
WHEREAS, Over the course of eleven days during the summer of 2012, three major water main breaks occurred throughout the City of Philadelphia; and
WHEREAS, On July 22, 2012, a break occurred in a forty-eight inch water main along 21st Street, creating a sinkhole encompassing the entire intersection of 21st and Bainbridge Streets, flooding several residences, damaging houses, destroying possessions, and forcing at least one hundred people to evacuate their homes; and
WHEREAS, On July 29, 2012, an eight inch water main ruptured on the 2800 block of Willits Road near Ashton Road; and
WHEREAS, On August 1, 2012, a forty-eight inch water main ruptured at the intersection of Front and Tioga Streets flooding several blocks in the area and interrupting water service to neighboring homes; and
WHEREAS, According to the Philadelphia Water Department, Philadelphia's water infrastructure system includes over three thousand miles of water mains and provides water to approximately one and a half million residents; and
WHEREAS, Eighty-seven percent of the water mains in Philadelphia are cast iron, a material that was replaced in the1960s as the industry standard and lacks the strength and flexibility of more modern materials; and
WHEREAS, In the City of Philadelphia, the average pipe is seventy-eight years old and, according the Philadelphia Water Department, various factors such as pipe type, construction technique and maintenance record contribute to the durability of water infrastructure; and
WHEREAS, The City of Philadelphia must ensure the quality and reliability of its water infrastructure in order to provide residents with a safe water supply while minimizing the risk of failures such as water main breaks that damage property and force residents from their homes; now therefore,
RESOLVED, BY THE COUNCIL OF THE CITY OF PHILADELPHIA, That City Council's Committee on Transportation and Public Utilities is hereby authorized to hold hearings to examine the condition of the City of Philadelphia's water infrastructure
.
End
Timeline
A file can move through several public steps, including introduction, hearings, amendments, votes and final action. This timeline puts those events in date order, groups routine entries from the same day, and attaches published member votes to the action they record.
Other recorded action without a published tally.
Source: LegislationDetail.aspx · gridLegislation
Marked unanimous; no member-by-member tally published.
A motion was made by Councilmember Johnson that this matter be Introduced and Ordered Placed on This Week's Final Passage Calendar. The motion carried unanimously.
Source: LegislationDetail.aspx · gridLegislation