RECOMMITTED
Other recorded action without a published tally.
Official action detail
Source: LegislationDetail.aspx · gridLegislation
THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:
SUBCODE A (THE PHILADELPHIA ADMINISTRATIVE CODE)
* * *
CHAPTER 3
PERMITS
* * *
A-301.1 Permits required:
An application shall be submitted to the department for the activities listed in Sections A-301.1.1 through A-301.1.[6]
7
and these activities shall not commence without a permit being issued in accordance with Section A-302.0. Where the scope of work includes more than one lot, a separate permit shall be required for each lot.
* * *
A-301.1.7 Excavation and Foundation Permit:
An excavation and foundation permit is required for any excavation, foundation, ground openings, sheeting/shoring, vaults and areaways where the activity requires a building permit. No permit shall be issued prior to the issuance of a zoning permit for the entire structure and provided that appropriate construction documents and required statements have been filed.
A-301.1.7.1
Related work
: Issuance of an excavation and foundation permit for a structure shall be the basis for issuance of plumbing and electrical permits for such work below grade.
A-301.1.7.2
Owner's risk
: The owner of a structure for which an excavation and foundation and related permits have been issued shall proceed at the owner's risk without assurance that a permit for the entire structure will be granted. Issuance of an excavation and foundation permit shall not be construed to establish vested rights to the building or related permits on the part of any party to the construction project.
* * *
[
A-301.9 Waste material notification:
Where the estimated cost of construction/alteration is in excess of $10,000.00, the applicant for a building permit shall immediately notify the City of Philadelphia Recycling Office of every hauler who will be handling the waste material generated by such activity. The information required for compliance with this Section shall be determined by the City of Philadelphia Recycling Office and shall include Waste Collection and/or Recyclable Material License number(s). Failure to comply with this requirement shall result in the immediate revocation of the building permit.]
A-301.9 Waste collection plan:
Where the estimated cost of construction, demolition, or alteration is in excess of $10,000.00, the applicant for a building permit must, within ten business days, submit to the City of Philadelphia Recycling Office a copy of the building permit application and, if applicable, a copy of the excavation and foundation permit, along with a waste collection plan detailing the project description, waste management goals, expected project waste material(s), method(s) of waste disposal, handling procedures, the name(s) of every waste removal company hired to remove and dispose of waste materials, and any other information required by the City of Philadelphia Recycling Office. A copy of the waste collection plan must be distributed to all subcontractors working on the project. Failure to comply with this requirement shall result in the immediate revocation of the building permit.
* * *
[A-302.6 Foundation permit:
The code official is authorized to issue a permit for the construction of foundations before the construction documents for the entire structure have been submitted provided the zoning permit for the entire structure has been issued and provided that appropriate construction documents and required statements have been filed.
A-302.6.1 Related work:
Issuance of a foundation permit for a structure shall be the basis for issuance of plumbing and electrical permits for such work below grade.
A-302.6.2 Owner's risk:
The owner of a structure for which a foundation and related permits have been issued shall proceed at the owner's risk without assurance that a permit for the entire structure will be granted. Issuance of a foundation permit shall not be construed to establish vested rights to the building or related permits on the part of any party to the construction project.]
* * *
CHAPTER 6
FINES
* * *
A-601.3 Fines for Class III offenses:
Notwithstanding subsection A-601.1, any person who violates any of the following provisions shall have committed a Class III offense and shall be subject to the fines set forth in subsection 1-109(3) of The Philadelphia Code:
A-301.1.5 (Zoning and Use Registration Permits);
[A-402.10.6 (Failure to provide for required demolition inspections);]
A-301.1.9 (Excavation and Foundation Permit);
1.2
A-402.10.6 (Failure to provide for required demolition inspections);
* * *
CHAPTER 9
FEES
* * *
A-902.2.4 [Foundation-only permits:
A building permit fee of $100.00 shall be paid prior to the issuance of a permit for the installation of foundations.]
Excavation and Foundation permits:
The permit fee for an excavation and foundation permit shall be $100 per lot.
* * *
___________________________________
Explanation:
[Brackets] indicate matter deleted.
Italics
indicate new matter added.
End
Timeline
A file can move through several public steps, including introduction, hearings, amendments, votes and final action. This timeline puts those events in date order, groups routine entries from the same day, and attaches published member votes to the action they record.
Other recorded action without a published tally.
Source: LegislationDetail.aspx · gridLegislation
Marked unanimous; no member-by-member tally published.
A motion was made by Councilmember Jones {\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\fnil\fcharset0 MS Sans Serif;}} \viewkind4\uc1\pard\f0\fs16 moved that Bill No. 150275 be removed from the Calendar and recommitted to the Committee of Licenses and Inspections. \par }. The motion carried unanimously.
Source: LegislationDetail.aspx · gridLegislation
Source: LegislationDetail.aspx · gridLegislation
A motion was made by Councilmember Quiñones Sánchez that this matter be SUSPEND THE RULES OF THE COUNCIL. The motion carried unanimously.
Source: LegislationDetail.aspx · gridLegislation
Source: LegislationDetail.aspx · gridLegislation
Source: LegislationDetail.aspx · gridLegislation
Source: LegislationDetail.aspx · gridLegislation
Source: LegislationDetail.aspx · gridLegislation
Source: LegislationDetail.aspx · gridLegislation
Marked unanimous; no member-by-member tally published.
A motion was made by Councilmember Jones that this matter be Introduced and Referred to the Committee on Licenses and Inspections. The motion carried unanimously.
Source: LegislationDetail.aspx · gridLegislation