Skip to main content
Back to search resultsBill 000348

Amending Title 4 of The Philadelphia Code ("The Building Construction and Occupancy Code") Subcode "A" Administrative Code, by revising various fees related to permits and miscellaneous administrative functions performed by the Department of Licenses and Inspections; and further amending Title 11 "Streets" of The Philadelphia Code, by revising certain sections related to fees for permits issued by the Department of Licenses and Inspections.

View file history View official file on Legistar →

File details

Status
Enacted
Type
Bill
Introduced
May 18, 2000
Sponsors
CMCouncilmember Mariano

Full Bill

THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:

SECTION 1. Title 4 of The Philadelphia Code is amended to read as follows:

TITLE 4. THE PHILADELPHIA BUILDING CONSTRUCTION

AND OCCUPANCY CODE

*

*

*

CHAPTER 4-200 TEXT OF SUBCODES

SUBCODE “A” (THE PHILADELPHIA ADMINISTRATIVE CODE)

*

*

*

CHAPTER 9

FEES

SECTION A-901.0 GENERAL

*

*

*

A-901.5 Refund of permit fees:

Where the work authorized by a permit is not commenced, a request for refund of the permit fee shall be accepted on forms provided by the department within one year from the date of permit issuance. An approved refund shall not exceed 50 percent of the permit fee minus any non-refundable filing fee prescribed by this chapter.

[Exception:

The non-refundable portion shall not exceed $500.00.

]

A-901.6 Fee Basis:

Permit and occupancy fees shall be calculated separately for each property.

A-901.7 Filing fees:

The department is authorized to require a non-refundable filing fee to be charged upon application for permits. The amount of the fees shall be determined by regulations of the department. Such filing fees shall be applied as a credit to the appropriate permit fee.

A-901.8 Accelerated plan review:

The department is authorized to provide accelerated review of plans associated with the issuance of building, zoning, and electrical permits. The fee for this service shall be in addition to any permit fee set forth in this Chapter. The fee shall be paid at the time an accelerated review is requested, and is not refundable. The fees for accelerated reviews shall be established by the department by regulation and published in appropriate schedules.

A-901.9 Administrative fees:

For items that require the department to perform administratively, the fee schedule is listed below:

For amending or transferring permits

$50.00

For review of building plans and department records more than one year old

$50.00

For copies of licenses, permits and certificates

$15.00

For processing a permit extension request

$50.00

Exception: Owner occupied one-family dwellings

No fee

For processing a permit reinstatement request

$50.00

Exception: Owner occupied one-family dwellings

No fee

For processing a request to have a scheduled hearing before an advisory board continued

$50.00

For the review of a zoning archive file

$50.00

For the first twelve pages of copies made from the contents of one zoning record

No fee

For each additional page copied from a zoning record

$1.00

A-901.10 Reinspection fee:

The department is authorized to charge a reinspection fee of $50.00 for each additional inspection that is required as a result of the need to re-schedule a scheduled inspection for one or more of the following reasons:

1.

The work is not performed in accordance with the applicable code;

2.

The work is not ready for inspection;

3.

Access to the work to be inspected is not provided.

An overtime fee of $50.00 per hour, with a minimum charge of four hours, shall be charged to any person requesting an inspection at any time other than normal working inspection hours.

A-901.11 Work without or in excess of a permit:

In addition to the permit fee, an inspection fee equal to the permit fee shall be imposed when work has commenced without first obtaining the required permit(s).

A-901.12 Contract submission:

The department is authorized to require the applicant to submit a copy of the original executed contract(s) to validate the declared scope and/or value of construction. Such copy shall be submitted prior to the issuance of the permit or prior to issuance of the Certificate of Occupancy or Certificate of Approval, at the department's option.

SECTION A-902.0 BUILDING

AND MECHANICAL

CODE FEES

*

*

*

A-902.2 Construction:

Permit

[

F

]

f

ees for new construction, additions, alterations

, demolition, occupancy

and repairs shall be as set forth in Sections A-902.2.1

.1 through A-902.2.1.4, except as otherwise specified in Sections A-902.2.2

through A-902.2.10.

A-902.2.1

.1

New Construction:

Fees for permits for new construction and additions shall be determined by Table A-902.2.1

.1

.

A-902.2.

1.

2 Shell buildings:

The building permit fee for shell buildings shall be 80 percent of the value determined by Section A-902.2.1. A shell building is defined as a building for which HVAC, lighting, suspended ceilings, plumbing and electrical systems, partition layouts and interior finishes in tenant spaces are not shown on the construction plans and for which separate tenant improvement plans will be submitted for a building permit at a later date.

Exception:

Use groups F, H and S.

TABLE A-902.2.1

.1

PERMIT FEE RATES

a

USE

TYPES OF CONSTRUCTION

GROUP

1

2

3 & 4

5

A-1

Theaters

$31.00

$29.00

$26.00

$22.00

A-2

Night Clubs, Dance Halls

$

23.00

$21.00

$20.00

$18.00

A-3

Halls and General Assembly

$23.00

$21.00

$20.00

$18.00

A-4

Places of Worship

$26.00

$25.00

$21.00

$17.00

B

Business

$24.00

$23.00

$20.00

$16.00

E

Educational

$27.00

$25.00

$21.00

$17.00

F

Factory and Industrial

$15.00

$13.00

$10.00

$ 9.00

H

High Hazard

$16.00

$12.00

$10.00

$ 8.00

I-1

Residential Care

$23.00

$21.00

$18.00

$17.00

I-2

Institutional-Incapacitated

$39.00

$38.00

$34.00

$31.00

I-3

Institutional-Restrained

$33.00

$30.00

$28.00

$25.00

M

Mercantile

$18.00

$16.00

$15.00

$11.00

R-1

Hotels and Motels

$24.00

$22.00

$19.00

$18.00

R-2

Multiple family Dwellings

$22.00

$20.00

$17.00

$15.00

R-3

One and Two family Dwellings

$21.00

$18.00

$16.00

$15.00

S

Storage

$14.00

$12.00

$10.00

$ 8.00

Open Sheds and Reviewing Stands

$12.00

$10.00

$ 8.00

$ 6.00

Note a: Rates are per one hundred (100) square feet or less.

A-902.2.

1.

3 Alterations and repairs:

Fees for alterations , for repairs, for the installation of fire protection systems, for ducts installed subsequent to the construction of a structure, for foundations for structures which do not require a building permit and for construction work not otherwise specified, shall be determined as follows:

1.

$55.00 for the first $1,000.00 of construction value or fraction thereof.

2.

$55.00 for the second $1,000.00 of construction value or fraction thereof.

3.

$25.00 for each additional $1,000.00 of construction value or fraction thereof.

A-902.2.

1.

3.1

Construction value:

The total value of the construction, shall include the value of all material, labor, engineering and/or architectural fees, the cost of the land and the overhead and profit cost inherent in the contract, whether or not any such items are provided at no cost.

A-902.2.

1.

4

Minimum

fee: A minimum fee of $100.00 shall apply to any permit for which the fee calculated by Section A-902.2.1

.1

and A-902.2.

1.

3 would otherwise be less than $100.00.

Exception:

For Use Group R-3 structures the minimum fee shall be $55.00.

A-902.2.

2

[5] Demolition:

Fees for permits for demolition shall be

[

$95.00 for 1,000 square feet or less for demolitions exclusive of basements and $50.00 for each additional 1,000 square fee or less

]

$10.00 per 100 square feet or fraction thereof, but shall not exceed $25,000.

Where

[

an

]

the permit

application

[

is made for a permit to

]

includes the

erect

ion of

a new structure at the same site, no demolition fee shall be required.

A-902.2.

3

[6] Fast form:

For work included in the Fast Form Building Permit procedure, the fees shall be as set forth in Sections A-902.2.

3

[

6

]

.1 through A-902.2.

3

[

6

]

.

10

[

8

]

.

A-902.2.

3

[6].1 For exterior wall covering:

4000 square feet or less

$

[

55

]

50

.00

More than 4000 square feet

$3.00 per 100 square feet

A-902.2.

3

[6].2 For replacement of roof covering:

4000 square feet or less

$

[

55

]

50

.00

More than 4000 square feet

$3.00 per 100 square feet

A-902.2.

3

[6].3 For replacement of windows and doors:

20

openings

[

units

]

or less

$

[

55

]

50

.00

More than 20

openings

[

units

]

$3.00 per

opening

[

unit

]

A-902.2.

3

[6].4 For replacement of a porch floor having a maximum area of:

200 square feet

$

[

55

]

50

.00

A-902.2.

3

[6].5 For relocation of fire sprinklers:

20 sprinklers or less

$

[

55

]

50

.00

More than 20 sprinklers

$3.00 per sprinkler

A-902.2.

3

[6].6 For relocation of HVAC diffusers or registers with flexible connectors:

20 units or less

$

[

55

]

50

.00

More than a 20 units

$3.00 per unit

A-902.2.

3

[6].7 For warm air heating apparatus [installation connected to a flue or chimney]:

Each unit

$

[

55

]

50

.00

A-902.2.

3

[6].8 For demolition of non-bearing partitions:

In space of 4,000 square feet or less

$

[

55

]

50

.00

In space more than 4000 square feet

$3.00 per 100 square feet

A-902.2.3.9 For the installation of roll-down security gates:

For each gate

$50.00

A-902.2.3.10 For the installation of ductwork within a single tenant space and the capacity of the equipment is equal to or less than 2000 cfm:

For each installation

$50.00

A-902.2.

4

[7] Foundation-

only

permits:

A

[

non-refundable

]

building permit fee of $

[

150

]

100

.00 shall be paid prior to the issuance of a permit for the installation of foundations

[

to support new construction or additions which will require a subsequent building permit.

]

A-902.2.5 Miscellaneous items:

Fees for miscellaneous items shall be as listed below:

Antennas — Roof- or ground-mounted (each)

$100.00

Canopies (each)

$100.00

Commercial cooking extinguishing systems (each)

$100.00

Commercial cooking exhaust systems and related components (per hood)

$100.00

Fence walls — Concrete and masonry

Accessory to a one- or two-family dwelling (each)

$50.00

All other properties (each)

$100.00

Fireplaces — Masonry and factory built (each)

$100.00

Harbor structures without buildings (each)

$500.00

Marquees (each)

$200.00

Outdoor decks (each)

$100.00

Ramps

Accessory to a one- or two-family dwelling (each)

$50.00

All other properties (each)

$100.00

Retaining walls more than two feet above the lower ground level

$100.00

Sidewalk and shelter platforms (each)

$100.00

Signs:

Accessory

$100.00

Outdoor advertising devices

$250.00

Swimming pools:

Above-ground (each)

$25.00

In-ground (each)

$100.00

A-902.2.6 Fire Suppression Equipment:

For the installation or alteration of fire suppression systems, except for commercial cooking extinguishing systems, the fee shall be as follows:

For each sprinkler head or suppression nozzle

$10.00

For the rough-in of piping for a sprinkler system (where separate from complete installation)

$125.00

For the installation of a backflow prevention device on a fire suppression system

(where presented as a separate permit)

$100.00

For each standpipe riser (per floor)

$50.00

For each yard hydrant

$50.00

For each fire pump

$250.00

A-902.2.7 Heating, Ventilating and Air Conditioning (HVAC) Systems:

For the installation of ductwork, the fee shall be $10.00 for each register or diffuser served by the ductwork.

A-902.2.8 Fast Track Permits:

For the review of documents submitted under the Fast Track Residential Reconstruction Program, a processing fee of $200.00 shall be added to the building permit fee.

A-902.2.9 Pre-paid Permits:

The department is authorized to print application blanks which shall be sold to licensed contractors in the amount of $25.00 and $100.00 each. Such applications, when completed by the contractor, shall be accepted for specific types of work as determined by the department.

A-902.2.10 Undetermined items:

For items of construction or alteration that are not included in Sections A-902.2.1 through A-902.2.9, the fee shall be two-percent of the total value of construction, but not less than $50.00.

Timeline

File history

A file can move through several public steps, including introduction, hearings, amendments, votes and final action. This timeline puts those events in date order, groups routine entries from the same day, and attaches published member votes to the action they record.

  1. Council ActionMAYOR

    SIGNED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  2. Member voteCITY COUNCIL

    PASSED

    Member-by-member vote published for this action.

    Pass16 Yes · 0 No · 0 AbsentView member votes →
    Official action detail

    A motion was made that this matter be PASSED. The motion carried by the following vote:

    Member votes

    MemberVote
    Angel OrtizYes
    Anna Cibotti VernaYes
    Blondell Reynolds BrownYes
    Brian J. O'NeillYes
    Darrell L. ClarkeYes
    David CohenYes
    Donna Reed MillerYes
    Frank J. DiCiccoYes
    Frank RizzoYes
    James F. KenneyYes
    Jannie L. BlackwellYes
    Joan L. KrajewskiYes
    Marian B. TascoYes
    Michael A. NutterYes
    Rick MarianoYes
    W. Wilson Goode, Jr.Yes

    Source: LegislationDetail.aspx · gridLegislation

    Council ActionCITY COUNCIL

    READ

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  3. 3 procedural actionsCITY COUNCIL
    ProceduralCITY COUNCIL

    ORDERED PLACED ON NEXT WEEK`S SECOND READING CALENDAR

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

    UnanimousCITY COUNCIL

    SUSPEND THE RULES OF THE COUNCIL

    Pass
    Official action detail

    A motion was made by Councilmember Mariano that this matter be SUSPEND THE RULES OF THE COUNCIL. The motion carried unanimously.

    Source: LegislationDetail.aspx · gridLegislation

    ProceduralCITY COUNCIL

    ORDERED PLACED ON THIS DAY`S FIRST READING CALENDAR

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  4. 3 procedural actionsCommittee on Licenses and Inspections
    ProceduralCommittee on Licenses and Inspections

    REPORTED FAVORABLY, RULE SUSPENSION REQUESTED

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  5. UnanimousCITY COUNCIL

    Introduced

    Marked unanimous; no member-by-member tally published.

    Pass
    Official action detail

    A motion was made by Councilmember Mariano that this matter be Introduced. The motion carried unanimously.

    Source: LegislationDetail.aspx · gridLegislation