Back to search resultsBill 040257

To adopt a Capital Program for the six Fiscal Years 2005-2010 inclusive.

View file history View official file on Legistar →

File details

Status
LAPSED
Type
Bill
Introduced
March 18, 2004
Sponsors
CBCouncilmember Blackwell

Full Bill

THE COUNCIL OF THE CITY OF PHILADELPHIA HEREBY ORDAINS:

SECTION 1. A Capital Program for the six Fiscal Years 2005 to 2010, inclusive, totaling five billion eighty-five million five hundred seventy-two thousand (5,085,572,000) dollars in estimated costs, is hereby adopted as follows:

2005

2006

2007

2008

2009

2010

2005-2010

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

CITY FUNDS - TAX SUPPORTED

CN New Loans

74,560

60,719

53,086

47,979

46,316

45,805

328,465

CR Operating Revenue

31,353

4,550

4,550

5,250

5,250

5,250

56,203

CT Carried Forward Loans

219,834

219,834

CA Prefinanced Loans

1,000

1,000

1,000

1,000

1,000

1,000

6,000

A PICA Prefinanced Loans

8,125

8,125

CITY FUNDS - SELF SUSTAINING

XN Self Sustaining New Loans

151,070

256,042

227,796

325,468

236,733

253,867

1,450,976

XR Self Sustaining Operating

59,023

16,548

16,748

16,948

17,148

17,348

143,763

XT Self Sustaining Operating

564,810

564,810

OTHER CITY FUNDS

Z Revolving Funds

16,000

2,000

2,000

2,000

2,000

2,000

26,000

OTHER THAN CITY FUNDS

FB Federal

248,094

107,028

107,024

74,406

63,832

65,292

665,676

FO Federal Off Budget

139,183

183,797

174,017

170,618

143,282

108,614

919,511

SB State

39,117

13,176

9,711

4,884

4,448

5,738

77,074

SO State Off Budget

52,183

65,152

47,479

44,522

64,132

66,576

340,044

PB Private

73,213

28,520

28,520

28,520

28,520

28,520

215,813

TB Other Governments/Agencies

56,514

56,514

TO Other Governments Off Budget

809

1,545

1,220

994

974

1,222

6,764

TOTALS ALL FUNDS

1,734,888

740,077

673,151

722,589

613,635

601,232

5,085,572

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

ART MUSEUM

ART MUSEUM COMPLEX - CAPITAL

|109|PHILADELPHIA MUSEUM OF ART - BUILDING REHABILITATION 1,000 465 585 950 950 950 4,900

1,000 CN 465 CN 585 CN 950 CN 950 CN 950 CN 4,900 CN

1A PHILADELPHIA MUSEUM OF ART - BUILDING REHAB-FY 04 1,000 1,000

1,000 CT 1,000 CT

1B PHILADELPHIA MUSEUM OF ART - BUILDING REHAB-FY 03 1,000 1,000

1,000 CT 1,000 CT

1C ART MUSEUM - BUILDING REHABILITATION-FY 02 1,000 1,000

1,000 CT 1,000 CT

1D ART MUSEUM - BUILDING REHABILITATION-FY 01 1,851 1,851

1,851 CT 1,851 CT

1E ART MUSEUM - BUILDING REHABILITATION-FY 00 4,240 4,240

2,056 A 2,056 A

2,184 CT 2,184 CT

1F BUILDING RENOVATIONS - FIRE, LIFE SAFETY

IMPROVEMENTS-FY 99 2,154 2,154

2,154 CT 2,154 CT

1G BUILDING RENOVATIONS-FY 98 260 260

260 CT 260 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

1H CRITICAL RENOVATIONS-FY 94 305 305

305 A 305 A

1I EXTERIOR/SITE IMPROVEMENTS-FY 98 105 105

105 CT 105 CT

1J FIRE, LIFE SAFETY & OTHER IMPS-FY 98 450 450

450 CT 450 CT

1K FIRE, LIFE SAFETY & OTHER IMPS-FY 96 468 468

468 CT 468 CT

1L FIRE, LIFE SAFETY & OTHER IMPS-FY 95 600 600

600 A 600 A

1M HANDICAPPED ACCESS-FY 95 230 230

230 A 230 A

|109|PHILADELPHIA MUSEUM OF ART - PERELMAN BUILDING RENOVATIONS 1,232 1,232 1,232 CN 1,232 CN

2A PHILADELPHIA MUSEUM OF ART - PERELMAN BUILDING RENOVATIONS

-FY 04 1,232 1,232

1,232 CT 1,232 CT

2B ART MUSEUM - RELIANCE (PERELMAN) BLDG-FY 03 1,424 1,424

1,424 CT 1,424 CT

2C RELIANCE BUILDING RENOVATIONS-FY 02 1,040 1,040

1,040 CT 1,040 CT

2D RELIANCE BUILDING RENOVATIONS-FY 01 1,108 1,108

1,108 CT 1,108 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

ART MUSEUM COMPLEX - CAPITAL 20,699 465 585 950 950 950 24,599

3,191 A 3,191 A

2,232 CN 465 CN 585 CN 950 CN 950 CN 950 CN 6,132 CN

15,276 CT 15,276 CT

ART MUSEUM 20,699 465 585 950 950 950 24,599

3,191 A 3,191 A

2,232 CN 465 CN 585 CN 950 CN 950 CN 950 CN 6,132 CN

15,276 CT 15,276 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

AVIATION

NORTHEAST PHILADELPHIA AIRPORT

|109|TAXIWAY EXPANSION PROGRAM 1,100 1,100 1,100 3,300

900 FB 900 FB 900 FB 2,700 FB

100 SB 100 SB 100 SB 300 SB

100 XN 100 XN 100 XN 300 XN

3A TAXIWAY EXPANSION PROGRAM-FY 04 2,000 2,000

1,800 FB 1,800 FB

100 SB 100 SB

100 XT 100 XT

3B TAXIWAY EXPANSION PROGRAM-FY 03 1,763 1,763

1,575 FB 1,575 FB

88 SB 88 SB

100 XT 100 XT

3C TAXIWAY C EXTENSION - PHASE II & III-FY 01 200 200

190 SB 190 SB

10 XT 10 XT

3D TAXIWAY C EXTENSION - PHASE II & III-FY 00 1,638 1,638

1,454 FB 1,454 FB

84 SB 84 SB

100 XT 100 XT

|109|AIRFIELD LIGHTING IMPROVEMENTS 500 500 1,000 450 FB 450 FB 900 FB

25 SB 25 SB 50 SB

25 XN 25 XN 50 XN

|109|SIDEWALK IMPROVEMENTS 250 250 500

250 XN 250 XN 500 XN

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

5A SIDEWALK IMPROVEMENTS-FY 04 250 250

250 XT 250 XT

|109|IMPROVEMENTS TO EXISTING FACILITIES 400 400 400 400 400 400 2,400

400 XN 400 XN 400 XN 400 XN 400 XN 400 XN 2,400 XN

6A IMPROVEMENTS TO EXISTING FACILITIES-FY 04 400 400

400 XT 400 XT

6B IMPROVEMENTS TO EXISTING FACILITIES-FY 03 400 400

400 XT 400 XT

6C IMPROVEMENTS TO EXISTING FACILITIES-FY 02 400 400

400 XT 400 XT

6D IMPS TO EXISTING FACIL - NE AIRPORT-FY 01 400 400

400 XT 400 XT

6E NEW VEHICLE STORAGE/MAINTENANCE BLDG-FY 03 2,300 2,300

1,725 SB 1,725 SB

575 XT 575 XT

6F NEW VEHICLE STORAGE/MAINTENANCE BLDG-FY 02 200 200

200 XT 200 XT

6G TERMINAL BLDG & PARKING LOT REN-FY 02 500 500

500 XT 500 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

NORTHEAST PHILADELPHIA AIRPORT 12,701 1,750 2,000 400 400 400 17,651

6,179 FB 900 FB 1,350 FB 8,429 FB

2,312 SB 100 SB 125 SB 2,537 SB

775 XN 750 XN 525 XN 400 XN 400 XN 400 XN 3,250 XN

3,435 XT 3,435 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

PHILADELPHIA INTERNATIONAL AIRPORT

|109|[RESERVED]

7A EMPLOYEE PARKING LOT - EXPANSION-FY 03 1,000 1,000

1,000 XT 1,000 XT

7B EMPLOYEE PARKING LOT - EXPANSION-FY 01 3,000 3,000

3,000 XR 3,000 XR

|109|TERMINAL EXPANSION & MODERNIZATION PROGRAM 27,000 17,000 7,000 7,000 7,000 7,000 72,000

3,500 PB 3,500 PB 3,500 PB 3,500 PB 3,500 PB 3,500 PB 21,000 PB

23,500 XN 13,500 XN 3,500 XN 3,500 XN 3,500 XN 3,500 XN 51,000 XN

8A AIRPORT SECURITY PROGRAM-FY 04 100,000 100,000

100,000 XT 100,000 XT

8B AIRPORT SECURITY PROGRAM-FY 03 30,000 30,000

10,000 FB 10,000 FB

20,000 XT 20,000 XT

8C COMMERCIAL ROADWAY COVERED WALKWAY SYS-FY 02 1,000 1,000

1,000 XR 1,000 XR

8D CONCESSION DEVELOPMENT PROGRAM-FY 98 932 932

932 XT 932 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

8E MOVING SIDEWALK - TERMINAL C TO D-FY 01 400 400

400 PB 400 PB

8F PASSENGER TERMINAL EXPANSION PROGRAM-FY 03 30,000 30,000

30,000 XT 30,000 XT

8G PASSENGER TERMINAL EXPANSION PROGRAM-FY 02 20,000 20,000

10,000 PB 10,000 PB

10,000 XT 10,000 XT

8H PASSENGER TERMINAL EXPANSION PROGRAM-FY 01 21,617 21,617

11,617 PB 11,617 PB

10,000 TB 10,000 TB

8I PASSENGER TERMINAL EXPANSION PROGRAM-FY 00 18,000 18,000

3,574 FB 3,574 FB

10,000 PB 10,000 PB

4,426 XT 4,426 XT

8J PASSENGER TERMINAL EXPANSION PROGRAM-FY 99 25,896 25,896

20,000 FB 20,000 FB

5,896 PB 5,896 PB

8K TERMINAL A RENOVATIONS-FY 04 5,000 5,000

5,000 XT 5,000 XT

8L TERMINAL A - RENOVATIONS-FY 03 4,362 4,362

4,362 XT 4,362 XT

8M TERMINAL RENOVATIONS AND ADDITIONS-FY 97 3,900 3,900

3,900 PB 3,900 PB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

|10 9|AIRPORT EXPANSION PROGRAM 6,000 25,700 6,000 4,000 3,300 8,000 53,000

6,000 XN 25,700 XN 6,000 XN 4,000 XN 3,300 XN 8,000 XN 53,000 XN

9A AIRPORT EXPANSION PROGRAM-FY 04 12,000 12,000

12,000 XT 12,000 XT

9B AIRPORT EXPANSION PROGRAM-FY 03 20,000 20,000

20,000 XT 20,000 XT

9C AIRPORT LAND ACQUISITION PROGRAM-FY 01 12,600 12,600

12,600 XR 12,600 XR

9D AIRPORT EXPANSION PROGRAM-FY 00 105,000 105,000

105,000 XT 105,000 XT

9E AIRSIDE EXPANSION PROGRAM-FY 95 2,287 2,287

2,287 XT 2,287 XT

9F PLANNING & DESIGN FOR FUTURE PROJECTS-FY 02 10,000 10,000

10,000 XT 10,000 XT

10 NOISE COMPATIBILITY PROGRAM 3,000 3,000 3,200 3,200 12,400

2,400 FB 2,400 FB 2,500 FB 2,500 FB 9,800 FB

600 XN 600 XN 700 XN 700 XN 2,600 XN

10A NOISE COMPATIBILITY PROGRAM-FY 04 3,200 3,200

2,400 FB 2,400 FB

800 XT 800 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

11 AIRFIELD CAPACITY ENHANCEMENT PROGRAM 10,000 175,000 175,000 200,000 200,000 200,000 960,000

5,000 FB 50,000 FB 50,000 FB 50,000 FB 50,000 FB 50,000 FB 255,000 FB

25,000 PB 25,000 PB 25,000 PB 25,000 PB 25,000 PB 125,000 PB

5,000 XN 100,000 XN 100,000 XN 125,000 XN 125,000 XN 125,000 XN 580,000 XN

11A AIRFIELD CAPACITY ENHANCEMENT PROGRAM-FY 04 18,631 18,631

13,631 FB 13,631 FB

5,000 XR 5,000 XR

11B COMMUTER APRON MODIFICATIONS-FY 03 3,200 3,200

3,200 XT 3,200 XT

11C COMMUTER APRON MODIFICATIONS-FY 02 800 800

800 XT 800 XT

11D RECONSTRUCTION OF TERMINAL D-E APRON-FY 04 14,000 14,000

10,500 FB 10,500 FB

3,500 XT 3,500 XT

11E RECONSTRUCTION OF TERMINAL D-E APRON-FY 03 3,040 3,040

2,300 FB 2,300 FB

740 XT 740 XT

11F AIRCRAFT APRON RECONSTR - TERM D TO E-FY 02 1,000 1,000

750 FB 750 FB

250 XT 250 XT

11G SECURITY CONTROL ACCESS SYS -PHASE 3-FY 99 2,343 2,343

2,343 PB 2,343 PB

11H TAXIWAY J AND CARGO CITY RAMP RECONSTR-FY 04 7,000 7,000

5,250 FB 5,250 FB

1,750 XT 1,750 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

11I TAXIWAY J/CARGO CITY RAMP RECONSTR-FY 03 5,000 5,000

3,750 FB 3,750 FB

1,250 XT 1,250 XT

11J TAXIWAY J/CARGO RAMP RECONSTRUCTION-FY 02 1,906 1,906

1,694 FB 1,694 FB

212 XT 212 XT

11K TAXIWAY J & CARGO CITY RAMP RECONSTR-FY 99 1,314 1,314

1,110 FB 1,110 FB

204 PB 204 PB

12 RUNWAY 17-35 EXTENSION 10,000 30,000 40,000

7,500 FB 20,000 FB 27,500 FB

5,000 SB 5,000 SB

2,500 XN 5,000 XN 7,500 XN

12A RUNWAY 17-35 EXTENSION-FY 04 3,000 3,000

1,500 FB 1,500 FB

1,500 XT 1,500 XT

12B AIRFIELD RENOVATIONS AND ADDITIONS-FY 03 12,000 12,000

6,000 FB 6,000 FB

6,000 XT 6,000 XT

12C AIRFIELD RENOVATIONS AND ADDITIONS-FY 02 2,977 2,977

2,227 FB 2,227 FB

750 XT 750 XT

13 RUNWAY 9R/27L RESURFACING 16,000 16,000

12,000 FB 12,000 FB

4,000 XN 4,000 XN

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

13A RUNWAY 9R/27L RESURFACING-FY 04 1,000 1,000

750 FB 750 FB

250 XT 250 XT

13B EXTENDED SAFETY AREA - RUNWAY 9R-FY 03 1,000 1,000

750 FB 750 FB

250 XT 250 XT

13C EXTENDED SAFETY AREA - RUNWAY 9R-FY 02 800 800

800 XT 800 XT

13D EXTENDED SAFETY AREA - RUNWAY 9R-FY 95 1,200 1,200

975 FB 975 FB

225 XT 225 XT

14 IMPROVEMENTS TO EXISTING FACILITIES 6,000 6,000 6,000 6,000 6,000 6,000 36,000

6,000 XN 6,000 XN 6,000 XN 6,000 XN 6,000 XN 6,000 XN 36,000 XN

14A IMPROVEMENTS TO EXISTING FACILITIES-FY 04 6,000 6,000

6,000 XT 6,000 XT

14B IMPROVEMENTS TO EXISTING FACILITIES-FY 03 12,000 12,000

12,000 XT 12,000 XT

14C IMPROVEMENTS TO EXISTING FACILITIES-FY 02 6,000 6,000

6,000 XT 6,000 XT

14D IMPROVEMENTS TO EXISTING FACILITIES-FY 01 5,874 5,874

5,874 XT 5,874 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

14E IMPROVEMENTS TO EXISTING FACILITIES-FY 98 3,814 3,814

2,859 XR 2,859 XR

955 XT 955 XT

14F ADA COMPLIANCE PROGRAM-FY 02 600 600

600 XT 600 XT

14G AHSL PLATFORM IMPROVEMENTS-FY 98 764 764

764 PB 764 PB

14H AIRCRAFT RESCUE/FIRE FIGHTING FAC EXP-FY 02 500 500

500 XT 500 XT

14I COMMUNICATIONS SYSTEM CABLE UPGRADE-FY 02 3,000 3,000

3,000 XT 3,000 XT

14J FACILITY MANAGEMENT SYSTEM-FY 04 2,000 2,000

1,500 FB 1,500 FB

500 XT 500 XT

14K FACILITY MANAGEMENT SYSTEM-FY 03 6,000 6,000

3,000 FB 3,000 FB

3,000 XT 3,000 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

14L FACILITY MANAGEMENT SYSTEM UPGRADE-FY 02 1,060 1,060

884 FB 884 FB

176 XT 176 XT

15 DOA MAINTENANCE CENTER 7,200 4,600 14,000 25,800

7,200 XN 4,600 XN 14,000 XN 25,800 XN

15A DIVISION OF AVIATION MAINTENANCE CENTER-FY 04 1,500 1,500

1,500 XT 1,500 XT

15B DOA MAINTENANCE CENTER-FY 03 1,500 1,500

1,500 XT 1,500 XT

15C DOA MAINTENANCE CENTER-FY 02 2,000 2,000

2,000 XT 2,000 XT

15D DOA MAINTENANCE CENTER-FY 99 3,268 3,268

3,268 XT 3,268 XT

15E DOA MAINTENANCE CENTER-FY 98 4,835 4,835

4,835 XT 4,835 XT

16 GROUND TRANSPORTATION CENTER 5,000 70,000 75,000

5,000 XN 70,000 XN 75,000 XN

16A GROUND TRANSPORTATION FACILITY IMPS-FY 04 2,500 2,500

2,500 XT 2,500 XT

17 AIRPORT ROADWAY SYSTEM MODIFICATIONS 15,000 15,000 30,000

11,250 FB 11,250 FB 22,500 FB

3,750 XN 3,750 XN 7,500 XN

17A AIRPORT ROADWAY SIGN LIGHTING-FY 02 500 500

500 XR 500 XR

17B AIRPORT ROADWAY SYSTEM MODIFICATIONS-FY 99 2,409 2,409

2,409 PB 2,409 PB

17C PERIMETER ROAD AND FENCE IMPROVEMENTS-FY 03 1,000 1,000

1,000 XT 1,000 XT

17D PERIMETER ROAD AND FENCE IMPROVEMENTS-FY 02 1,880 1,880

978 FB 978 FB

902 XT 902 XT

18 DIVISION OF AVIATION ADMINISTRATIVE OFFICES 12,000 12,000

12,000 XN 12,000 XN

18A EQUIPMENT & VEHICLE ACQUISITION PROG-FY 98 900 900

900 XT 900 XT

PHILADELPHIA INTERNATIONAL AIRPORT 658,309 263,900 221,800 319,200 216,300 233,000 1,912,509

120,423 FB 72,400 FB 63,750 FB 63,750 FB 50,000 FB 50,000 FB 420,323 FB

51,033 PB 28,500 PB 28,500 PB 28,500 PB 28,500 PB 28,500 PB 193,533 PB

5,000 SB 5,000 SB

10,000 TB 10,000 TB

47,600 XN 158,000 XN 129,550 XN 226,950 XN 137,800 XN 154,500 XN 854,400 XN

24,959 XR 24,959 XR

404,294 XT 404,294 XT

AVIATION 671,010 265,650 223,800 319,600 216,700 233,400 1,930,160

126,602 FB 73,300 FB 65,100 FB 63,750 FB 50,000 FB 50,000 FB 428,752 FB

51,033 PB 28,500 PB 28,500 PB 28,500 PB 28,500 PB 28,500 PB 193,533 PB

2,312 SB 5,100 SB 125 SB 7,537 SB

10,000 TB 10,000 TB

48,375 XN 158,750 XN 130,075 XN 227,350 XN 138,200 XN 154,900 XN 857,650 XN

24,959 XR 24,959 XR

407,729 XT 407,729 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CAPITAL PROGRAM OFFICE

CAPITAL PROGRAM ADMINISTRATION

19 CAPITAL PROGRAM ADMINISTRATION DESIGN AND ENGINEERING 6,773 6,455 6,164 5,943 5,943 5,943 37,221 6,773 CN 6,455 CN 6,164 CN 5,943 CN 5,943 CN 5,943 CN 37,221 CN

19A CPO ADMINISTRATION, DESIGN & ENGINEERING-FY 04 2,846 2,846

2,846 CT 2,846 CT

19B CPO ADMIN, DESIGN & ENGINEERING-FY 03 2,699 2,699

2,699 CT 2,699 CT

19C CPO ADMIN, DESIGN & ENGINEERING-FY 02 1,874 1,874

1,874 CT 1,874 CT

19D CPO ADMIN, DESIGN & ENGINEERING-FY 01 498 498

498 CT 498 CT

19E CPO ADMIN, DESIGN & ENGINEERING-FY 00 584 584

584 CT 584 CT

CAPITAL PROGRAM ADMINISTRATION 15,274 6,455 6,164 5,943 5,943 5,943 45,722

6,773 CN 6,455 CN 6,164 CN 5,943 CN 5,943 CN 5,943 CN 37,221 CN

8,501 CT 8,501 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CAPITAL PROJECTS

20 CITYWIDE ENVIRONMENTAL REMEDIATION 300 300 300 300 600 300 2,100

300 CN 300 CN 300 CN 300 CN 600 CN 300 CN 2,100 CN

20A CITYWIDE ENVIRONMENTAL REMEDIATION-FY 04 366 366

366 CT 366 CT

20B CITYWIDE ENVIRONMENTAL REMEDIATION-FY 01 266 266

266 CT 266 CT

21 IMPROVEMENTS TO FACILITIES 1,650 1,650 1,650 1,650 1,650 1,650 9,900

1,000 CA 1,000 CA 1,000 CA 1,000 CA 1,000 CA 1,000 CA 6,000 CA

650 CR 650 CR 650 CR 650 CR 650 CR 650 CR 3,900 CR

21A CITYWIDE ACCESSIBILITY MODIFICATIONS-FY 04 100 100

100 CT 100 CT

21B ADA-ACCESSIBILITY IMPROVEMENTS-FY 95 16 16

16 A 16 A

21C ADA-ACCESSIBILITY IMPROVEMENTS-FY 94 100 100

100 A 100 A

21D RECREATION FACILITIES ASSESSMENT STUDY-FY 04 377 377

377 CT 377 CT

CAPITAL PROJECTS 3,175 1,950 1,950 1,950 2,250 1,950 13,225

116 A 116 A

1,000 CA 1,000 CA 1,000 CA 1,000 CA 1,000 CA 1,000 CA 6,000 CA

300 CN 300 CN 300 CN 300 CN 600 CN 300 CN 2,100 CN

650 CR 650 CR 650 CR 650 CR 650 CR 650 CR 3,900 CR

1,109 CT 1,109 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CAPITAL PROGRAM OFFICE 18,449 8,405 8,114 7,893 8,193 7,893 58,947

116 A 116 A

1,000 CA 1,000 CA 1,000 CA 1,000 CA 1,000 CA 1,000 CA 6,000 CA

7,073 CN 6,755 CN 6,464 CN 6,243 CN 6,543 CN 6,243 CN 39,321 CN

650 CR 650 CR 650 CR 650 CR 650 CR 650 CR 3,900 CR

9,610 CT 9,610 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

COMMERCE

COMMERCIAL DEVELOPMENT

22 NEIGHBORHOOD COMMERCIAL CENTERS - SITE IMPROVEMENTS 2,000 2,000 2,000 2,000 2,000 2,000 12,000

1,000 CN 1,000 CN 1,000 CN 1,000 CN 1,000 CN 1,000 CN 6,000 CN

1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 6,000 SB

22A NCC - SITE IMPROVEMENTS-FY 04 1,000 1,000

1,000 CT 1,000 CT

22B NCC - SITE IMPROVEMENTS-FY 03 1,200 1,200

200 CT 200 CT

1,000 SB 1,000 SB

22C NCC - SITE IMPROVEMENTS-FY 02 554 554

554 CT 554 CT

22D NCC - SITE IMPROVEMENTS-FY 01 1,000 1,000

1,000 CT 1,000 CT

22E NCC - SITE IMPROVEMENTS-FY 00 690 690

690 CT 690 CT

22F NEIGHBORHOOD COMMERCIAL CENTERS-FY 99 403 403

403 CT 403 CT

22G AVENUE OF THE ARTS-FY 04 40 40

40 CT 40 CT

22H AVENUE OF THE ARTS - N. BROAD STREET-FY 03 3,150 3,150

3,150 SB 3,150 SB

22I AVENUE OF THE ARTS - N & S BROAD ST-FY 01 500 500

500 CT 500 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

22J AVENUE OF THE ARTS - N & S BROAD ST-FY 00 1,000 1,000

1,000 CT 1,000 CT

22K AVENUE OF THE ARTS - N & S BROAD ST-FY 99 2,332 2,332

332 CT 332 CT

2,000 TB 2,000 TB

22L CONVENTION CENTER AREA RENEWAL-FY 00 1,701 1,701

1,701 CT 1,701 CT

22M CONVENTION CENTER AREA - RENEWAL-FY 99 298 298

298 CT 298 CT

22N CONVENTION CENTER AREA-IMPROVEMENTS-FY 98 478 478

478 CT 478 CT

22O CONVENTION CENTER AREA-IMPROVEMENTS-FY 96 500 500

500 CT 500 CT

22P CONVENTION CENTER EXPANSION-FY 04 2,000 2,000

2,000 CT 2,000 CT

COMMERCIAL DEVELOPMENT 18,846 2,000 2,000 2,000 2,000 2,000 28,846

1,000 CN 1,000 CN 1,000 CN 1,000 CN 1,000 CN 1,000 CN 6,000 CN

10,696 CT 10,696 CT

5,150 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 10,150 SB

2,000 TB 2,000 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

INDUSTRIAL DEVELOPMENT

23 ENVIRONMENTAL ASSESSMENT/REMEDIATION 1,700 1,700 1,700 5,100

200 CN 200 CN 200 CN 600 CN

500 FB 500 FB 500 FB 1,500 FB

1,000 SB 1,000 SB 1,000 SB 3,000 SB

23A ENVIRONMENTAL ASSESSMENT/REMEDIATION-FY 00|99| |99|

|99|CT |99|CT

24 NEIGHBORHOOD INDUSTRIAL DISTRICTS 300 300 300 900

150 CN 150 CN 150 CN 450 CN

150 SB 150 SB 150 SB 450 SB

24A ENTERPRISE AND EMPOWERMENT ZONE IMPS-FY 04 250 250

250 CT 250 CT

24B NEIGHBORHOOD INDUST DISTS - IMPS & ADMIN-FY 04 150 150

150 CT 150 CT

24C NEIGHBORHOOD IND DISTS - IMPS & ADMIN-FY 02 50 50

50 CT 50 CT

24D NEIGHBORHOOD INDUSTRIAL DISTS - IMPS-FY 00 271 271

271 CT 271 CT

24E RICHMOND IND AREA - PARKING LOT DEVEL-FY 01 800 800

800 CT 800 CT

25 PIDC LANDBANK ACQUISITION & IMPROVEMENTS 11,000 1,000 1,000 1,000 1,000 1,000 16,000

11,000 Z 1,000 Z 1,000 Z 1,000 Z 1,000 Z 1,000 Z 16,000 Z

25A MEETINGHOUSE ROAD/MCNULTY ROAD - IMPS-FY 01 300 300

300 CT 300 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

25B PIDC - LAND ACQUISITION AND IMPS-FY 02 3,700 3,700

3,700 CT 3,700 CT

26 WEST PARKSIDE UTILITY RELOCATIONS AND IMPROVEMENTS 225 225

225 CN 225 CN

27 GRADING AND PAVING - NEW AND EXISTING STREETS 250 250 250 750

250 CN 250 CN 250 CN 750 CN

27A GRADING & PAVING - NEW/EXISTING STS-FY 03 38 38

38 CT 38 CT

27B FOOD DISTRIBUTION CENTER - IMPS-FY 02 1,000 1,000

1,000 CT 1,000 CT

27C INFRASTRUCTURE DEVELOPMENT- EDA MATCH-FY 02 600 600

600 CT 600 CT

27D PHILADELPHIA AUTO MALL - IMPROVEMENTS-FY 01 1,307 1,307

1,307 CT 1,307 CT

27E PHILA AUTO MALL - STREETSCAPE IMPS-FY 00 1,449 1,449

1,449 CT 1,449 CT

28 PIDC LANDBANK IMPROVEMENTS, ENGINEERING

AND ADMINISTRATION 5,000 1,000 1,000 1,000 1,000 1,000 10,000

5,000 Z 1,000 Z 1,000 Z 1,000 Z 1,000 Z 1,000 Z 10,000 Z

28A BYBERRY REUSE PLAN-FY 01 100 100

100 CT 100 CT

28B BYBERRY REUSE PLAN-FY 99 250 250

250 CT 250 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

INDUSTRIAL DEVELOPMENT 26,744 4,000 2,250 4,000 2,250 4,000 43,244 475 CN 350 CN 250 CN 350 CN 250 CN 350 CN 2,025 CN

10,269 CT 10,269 CT

500 FB 500 FB 500 FB 1,500 FB

1,150 SB 1,150 SB 1,150 SB 3,450 SB

16,000 Z 2,000 Z 2,000 Z 2,000 Z 2,000 Z 2,000 Z 26,000 Z

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

PENN'S LANDING / WATERFRONT IMPS

29 PENN'S LANDING IMPROVEMENTS 500 350 100 250 250 1,450

500 CN 350 CN 100 CN 250 CN 250 CN 1,450 CN

30 SCHUYLKILL RIVER TRAIL IMPROVEMENTS 500 500 500 500 500 500 3,000

250 CN 250 CN 250 CN 250 CN 250 CN 250 CN 1,500 CN

250 SB 250 SB 250 SB 250 SB 250 SB 250 SB 1,500 SB

30A CONSERVATION OF ART-FY 02 300 300

300 CT 300 CT

30B CONSERVATION OF ART-FY 00 414 414

414 CT 414 CT

30C CONSERVATION OF ART-FY 99|99| |99|

|99|CT |99|CT

30D CONSERVATION OF ART-FY 98 41 41

41 CT 41 CT

PENN'S LANDING / WATERFRONT IMPS 1,759 850 600 750 500 750 5,209

750 CN 600 CN 350 CN 500 CN 250 CN 500 CN 2,950 CN

759 CT 759 CT

250 SB 250 SB 250 SB 250 SB 250 SB 250 SB 1,500 SB

COMMERCE 47,349 6,850 4,850 6,750 4,750 6,750 77,299

2,225 CN 1,950 CN 1,600 CN 1,850 CN 1,500 CN 1,850 CN 10,975 CN

21,724 CT 21,724 CT

500 FB 500 FB 500 FB 1,500 FB

5,400 SB 2,400 SB 1,250 SB 2,400 SB 1,250 SB 2,400 SB 15,100 SB

2,000 TB 2,000 TB

16,000 Z 2,000 Z 2,000 Z 2,000 Z 2,000 Z 2,000 Z 26,000 Z

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

EMERGENCY SHELTER AND SERVICES

FAMILY CARE FACILITIES - CAPITAL

31 OESS FACILITY RENOVATIONS 235 200 400 450 450 400 2,135

235 CN 200 CN 400 CN 450 CN 450 CN 400 CN 2,135 CN

31A OESS FACILITY RENOVATIONS-FY 04 500 500

500 CT 500 CT

31B OESS RENOVATIONS-FY 03 551 551

551 CT 551 CT

31C OESS RENOVATIONS-FY 02 292 292

292 CT 292 CT

31D GATEWAY SHELTER FACILITY-ACQUISITION-FY 95 17 17

17 CT 17 CT

FAMILY CARE FACILITIES - CAPITAL 1,595 200 400 450 450 400 3,495

235 CN 200 CN 400 CN 450 CN 450 CN 400 CN 2,135 CN

1,360 CT 1,360 CT

EMERGENCY SHELTER AND SERVICES 1,595 200 400 450 450 400 3,495

235 CN 200 CN 400 CN 450 CN 450 CN 400 CN 2,135 CN

1,360 CT 1,360 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FAIRMOUNT PARK COMMISSION

FAIRMOUNT PARK - CAPITAL

32 ATHLETIC AND PLAY AREA IMPROVEMENTS 525 250 200 200 200 200 1,575

525 CN 250 CN 200 CN 200 CN 200 CN 200 CN 1,575 CN

32A ATHLETIC AND PLAY AREA IMPROVEMENTS-FY 04 120 120

120 CT 120 CT

32B ATHLETIC & PLAY AREA IMPROVEMENTS-FY 02 16 16

16 CT 16 CT

32C ATHLETIC AND PLAY AREA IMPROVEMENTS-FY 01 181 181

181 CT 181 CT

33 BUILDING IMPROVEMENTS 900 320 420 375 350 350 2,715

900 CN 320 CN 420 CN 375 CN 350 CN 350 CN 2,715 CN

33A BUILDING IMPROVEMENTS-FY 04 500 500

500 CT 500 CT

33B BUILDING IMPROVEMENTS-FY 03 255 255

255 CT 255 CT

33C BUILDING IMPROVEMENTS-FY 02 59 59

59 CT 59 CT

33D BUILDING IMPROVEMENTS-FY 00|99| |99|

|99|CT |99|CT

33E BUILDING IMPROVEMENTS-FY 99|99| |99|

|99|CT |99|CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

34 FACILITY IMPROVEMENTS 1,968 315 675 385 500 425 4,268

868 CN 315 CN 675 CN 385 CN 500 CN 425 CN 3,168 CN

700 PB 700 PB

400 SB 400 SB

34A FACILITY IMPROVEMENTS-FY 04 1,250 1,250

900 CT 900 CT

350 SB 350 SB

34B FACILITY IMPROVEMENTS-FY 03 1,200 1,200

400 CT 400 CT

400 FB 400 FB

400 SB 400 SB

34C FACILITY IMPROVEMENTS-FY 02|99| |99|

|99|CT |99|CT

34D FACILITY IMPROVEMENTS-FY 01 400 400

400 SB 400 SB

34E PARKWIDE FACILITIES IMPROVEMENTS-FY 00 133 133

33 CT 33 CT

100 PB 100 PB

34F PARKWIDE FACILITIES IMPROVEMENTS-FY 99 161 161

|99|CT |99|CT

160 PB 160 PB

34G CAPITAL PROGRAM ADMINISTRATION-FY 98 69 69

69 CT 69 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

34H CAPITAL PROGRAM ADMINISTRATION-FY 96|99| |99|

|99|CT |99|CT

34I PARK CULTURAL AND EDUCATIONAL FACILITIES-FY 97 39 39

39 PB 39 PB

35 HISTORIC BUILDING IMPROVEMENTS 700 1,800 255 580 550 300 4,185

700 CN 1,800 CN 255 CN 580 CN 550 CN 300 CN 4,185 CN

35A HISTORIC BUILDING IMPROVEMENTS-FY 04 750 750

750 CT 750 CT

35B HISTORIC BUILDING IMPROVEMENTS-FY 03 1,311 1,311

1,311 CT 1,311 CT

35C HISTORIC BUILDINGS - IMPROVEMENTS-FY 02 180 180

180 CT 180 CT

35D HISTORIC BUILDING IMPROVEMENTS-FY 01 1,216 1,216

736 CT 736 CT

480 FB 480 FB

35E HISTORIC BUILDING IMPROVEMENTS-FY 00 553 553

255 CT 255 CT

174 PB 174 PB

124 SB 124 SB

36 PARK AND STREET TREES 300 300 300 300 300 300 1,800

300 CN 300 CN 300 CN 300 CN 300 CN 300 CN 1,800 CN

36A PARK AND STREET TREES-FY 04 204 204

204 CT 204 CT

36B PARK AND STREET TREES-FY 03 41 41

41 CT 41 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

37 PARKLAND - SITE IMPROVEMENTS 3,140 100 700 710 650 700 6,000

1,350 CN 100 CN 700 CN 710 CN 650 CN 700 CN 4,210 CN

1,790 FB 1,790 FB

37A PARKLAND - SITE IMPROVEMENTS-FY 04 331 331

331 CT 331 CT

37B PARKLAND - SITE IMPROVEMENTS-FY 02 2,337 2,337

736 CT 736 CT

85 FB 85 FB

1,516 SB 1,516 SB

37C PARKLAND - SITE IMPROVEMENTS-FY 01 44 44

44 CT 44 CT

37D PARKLAND - SITE IMPROVEMENTS-FY 00 160 160

160 SB 160 SB

37E PARKLAND - SITE IMPROVEMENTS-FY 99 25 25

25 SB 25 SB

37F PARKLAND - SITE IMPROVEMENTS-FY 97 80 80

80 FB 80 FB

37G HISTORIC SQUARE IMPROVEMENTS-FY 00 27 27

27 CT 27 CT

37H HISTORIC SQUARE IMPROVEMENTS-FY 99|99| |99|

|99|CT |99|CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

37I MANAYUNK CANAL IMPROVEMENTS-FY 01 381 381

381 SB 381 SB

37J MANAYUNK CANAL RESTORATION-FY 00 2,681 2,681

441 A 441 A

2,240 SB 2,240 SB

37K MANAYUNK RECREATION PATH-FY 00 824 824

24 CT 24 CT

800 SB 800 SB

37L ISTEA GRANT-MANAYUNK CANAL PATHWAY-FY 94 776 776

776 FB 776 FB

37M PARKSIDE IMPS - GROWING GREENER GRANT-FY 03 971 971

296 CT 296 CT

675 SB 675 SB

37N PARKSIDE IMPROVEMENTS-FY 02 1,529 1,529

444 CT 444 CT

1,085 SB 1,085 SB

37O SCHUYLKILL RIVER PARK-FY 99 109 109

109 SB 109 SB

37P WASHINGTON MONUMENT RESTORATION-FY 98 11 11

11 CT 11 CT

38 ROADWAYS, FOOTWAYS, AND PARKING 250 250 250 250 250 250 1,500

250 CN 250 CN 250 CN 250 CN 250 CN 250 CN 1,500 CN

38A ROADWAYS, FOOTWAYS, AND PARKING-FY 04 380 380

380 CT 380 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

38B ROADWAYS, FOOTWAYS AND PARKING-FY 03 81 81

81 CT 81 CT

38C COBBS CREEK RECREATION PATH-FY 00 440 440

440 CT 440 CT

38D COBBS CREEK RECREATION PATH-FY 98 1,261 1,261

1,261 FB 1,261 FB

FAIRMOUNT PARK - CAPITAL 28,893 3,335 2,800 2,800 2,800 2,525 43,153

441 A 441 A

4,893 CN 3,335 CN 2,800 CN 2,800 CN 2,800 CN 2,525 CN 19,153 CN

8,849 CT 8,849 CT

4,872 FB 4,872 FB

1,173 PB 1,173 PB

8,665 SB 8,665 SB

FAIRMOUNT PARK COMMISSION 28,893 3,335 2,800 2,800 2,800 2,525 43,153

441 A 441 A

4,893 CN 3,335 CN 2,800 CN 2,800 CN 2,800 CN 2,525 CN 19,153 CN

8,849 CT 8,849 CT

4,872 FB 4,872 FB

1,173 PB 1,173 PB

8,665 SB 8,665 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FINANCE

CAPITAL PROJECTS

38Z NEW VOTING MACHINES - FY 01 56 56

56 CT 56 CT

CAPITAL PROJECTS 56 56

56 CT 56 CT

FINANCE 56 56

56 CT 56 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FIRE

FIRE FACILITIES

39 FIRE DEPARTMENT COMPUTER SYSTEM IMPROVEMENTS 50 700 700 700 700 2,850

700 CN 700 CN

50 CR 700 CR 700 CR 700 CR 2,150 CR

39A FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 04 375 375

375 CR 375 CR

39B FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 03 925 925

925 CR 925 CR

39C FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 02 252 252

252 CT 252 CT

39D FIRE DEPARTMENT COMPUTER SYSTEM IMPS-FY 01 140 140

140 CT 140 CT

39E COMPUTER AIDED DISPATCH SYS UPGRADE-FY 95 121 121

121 CR 121 CR

40 FIRE DEPARTMENT INTERIOR AND EXTERIOR RENOVATIONS 1,400 1,450 1,150 800 800 800 6,400

650 CN 1,450 CN 1,150 CN 800 CN 800 CN 800 CN 5,650 CN

750 FB 750 FB

40A FIRE DEPT INTERIOR/EXTERIOR RENOVATIONS-FY 04 3,361 3,361

1,361 CT 1,361 CT

2,000 FB 2,000 FB

40B FIRE DEPT INTERIOR/EXTERIOR RENOV-FY 03 353 353

353 CT 353 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

40C FIRE DEPT INTERIOR/EXTERIOR RENOV-FY 02 514 514

514 CT 514 CT

40D FIRE DEPARTMENT INTERIOR RENOVATIONS-FY 01|99| |99|

|99|CT |99|CT

40E FIRE FACIL - EXPANSION/RECONSTRUCTION-FY 00 290 290

290 CT 290 CT

40F FIRE FACILITIES -CRITICAL RENOVATIONS-FY 99 89 89

89 CT 89 CT

40G N PHILA FIRE FACIL-ASSESSMENT/DESIGN-FY 99 80 80

80 CT 80 CT

40H FIRE DEPARTMENT ROOF REPLACEMENTS-FY 01 13 13

13 CT 13 CT

40I ROOF REPLACEMENTS-FY 00|99| |99|

|99|CT |99|CT

FIRE FACILITIES 7,975 1,450 1,850 1,500 1,500 1,500 15,775

650 CN 1,450 CN 1,850 CN 800 CN 800 CN 800 CN 6,350 CN

1,471 CR 700 CR 700 CR 700 CR 3,571 CR

3,104 CT 3,104 CT

2,750 FB 2,750 FB

FIRE 7,975 1,450 1,850 1,500 1,500 1,500 15,775

650 CN 1,450 CN 1,850 CN 800 CN 800 CN 800 CN 6,350 CN

1,471 CR 700 CR 700 CR 700 CR 3,571 CR

3,104 CT 3,104 CT

2,750 FB 2,750 FB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FLEET MANAGEMENT

CAPITAL PROJECTS

41 FLEET MANAGEMENT FACILITIES 550 330 150 150 150 150 1,480

550 CN 330 CN 150 CN 150 CN 150 CN 150 CN 1,480 CN

41A FLEET MANAGEMENT FACILITIES-FY 04 23 23

23 CT 23 CT

41B RENOVATIONS - FLEET MANAGEMENT SHOPS-FY 01|99| |99|

|99|CT |99|CT

41C RENOVATIONS - FLEET MANAGEMENT SHOPS-FY 99|99| |99|

|99|CT |99|CT

41D FLEET MANAGEMENT FACILITIES IMPS-FY 98 39 39

39 CT 39 CT

41E FIRE BOAT REPLACEMENT-FY 01 203 203

203 CT 203 CT

42 FUEL TANK REPLACEMENT 600 600 600 600 600 600 3,600

200 CN 200 CN 200 CN 200 CN 200 CN 200 CN 1,200 CN

400 SB 400 SB 400 SB 400 SB 400 SB 400 SB 2,400 SB

42A FUEL TANK REPLACEMENT-FY 04 550 550

150 CT 150 CT

400 SB 400 SB

CAPITAL PROJECTS 1,978 930 750 750 750 750 5,908

750 CN 530 CN 350 CN 350 CN 350 CN 350 CN 2,680 CN

428 CT 428 CT

800 SB 400 SB 400 SB 400 SB 400 SB 400 SB 2,800 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FLEET MANAGEMENT 1,978 930 750 750 750 750 5,908

750 CN 530 CN 350 CN 350 CN 350 CN 350 CN 2,680 CN

428 CT 428 CT

800 SB 400 SB 400 SB 400 SB 400 SB 400 SB 2,800 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FREE LIBRARY

LIBRARY FACILITIES - CAPITAL

43 BRANCH LIBRARIES - IMPROVEMENTS 900 600 550 550 450 450 3,500

900 CN 600 CN 550 CN 550 CN 450 CN 450 CN 3,500 CN

43A BRANCH LIBRARY IMPROVEMENTS-FY 04 411 411

411 CT 411 CT

43B BRANCH LIBRARIES - IMPROVEMENTS-FY 03 75 75

75 CT 75 CT

43C BRANCH LIBRARIES - IMPROVEMENTS-FY 02 26 26

26 CT 26 CT

43D BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 04 300 300

300 CT 300 CT

43E BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 03 583 583

66 CT 66 CT

154 PB 154 PB

363 SB 363 SB

43F BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 02 692 692

692 CT 692 CT

43G BRANCH LIBRARIES - MAJOR RENOVATIONS-FY 01 100 100

100 CT 100 CT

43H BRANCH LIBRARY RENOVATIONS/IMPS-FY 00 119 119

119 CT 119 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

43I BRANCH REPLACEMENT AND RECONSTRUCTION-FY 04 301 301

301 CT 301 CT

43J BRANCH REPLACEMENT AND RECONSTRUCTION-FY 03 30 30

30 CT 30 CT

43K BRANCH REPLACEMENT AND RECONSTRUCTION-FY 02 14 14

14 CT 14 CT

44 CENTRAL LIBRARY RENOVATIONS 50 200 200 200 200 200 1,050

50 CN 200 CN 200 CN 200 CN 200 CN 200 CN 1,050 CN

44A CENTRAL LIBRARY RENOVATIONS-FY 04 200 200

200 CT 200 CT

44B CENTRAL LIBRARY RENOVATIONS-FY 02 240 240

240 CT 240 CT

44C AUTOMATION UPGRADES AND EXPANSION-FY 02 60 60

60 CT 60 CT

44D PROP ACQUISITION - FREE LIBRARY PROJ-FY 01 91 91

91 CT 91 CT

LIBRARY FACILITIES - CAPITAL 4,192 800 750 750 650 650 7,792

950 CN 800 CN 750 CN 750 CN 650 CN 650 CN 4,550 CN

2,725 CT 2,725 CT

154 PB 154 PB

363 SB 363 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

FREE LIBRARY 4,192 800 750 750 650 650 7,792

950 CN 800 CN 750 CN 750 CN 650 CN 650 CN 4,550 CN

2,725 CT 2,725 CT

154 PB 154 PB

363 SB 363 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

HEALTH

HEALTH FACILITIES

45 HEALTH ADMINISTRATION BUILDING 200 200 400

200 CN 200 CN 400 CN

45A HEALTH ADMINISTRATION BUILDING-FY 04 200 200

200 CT 200 CT

45B HEALTH ADMINISTRATION BUILDING-FY 03 80 80

80 CT 80 CT

45C HEALTH ADMINISTRATION BUILDING-FY 99|99| |99|

|99|CT |99|CT

46 HEALTH DEPARTMENT EQUIPMENT AND REPAIRS 1,000 1,000 1,000 1,000 1,000 1,000 6,000

1,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 6,000 CR

46A HEALTH DEPARTMENT EQUIPMENT AND REPAIRS-FY 04 1,000 1,000

1,000 CR 1,000 CR

47 HEALTH FACILITY RENOVATIONS 640 480 250 250 250 250 2,120

640 CN 480 CN 250 CN 250 CN 250 CN 250 CN 2,120 CN

47A HEALTH FACILITY RENOVATIONS-FY 04 790 790

790 CT 790 CT

47B HEALTH FACILITY RENOVATIONS-FY 03 392 392

392 CT 392 CT

47C HEALTH FACILITY RENOVATIONS-FY 02 27 27

27 CT 27 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

47D HEALTH FACILITY RENOVATIONS-FY 00 327 327

327 CT 327 CT

48 MEDICAL EXAMINER'S OFFICE 3,300 3,300 1,500 CN 1,500 CN

1,800 SB 1,800 SB

48A MEDICAL EXAMINER'S OFFICE-FY 04 350 350

350 CT 350 CT

HEALTH FACILITIES 8,314 1,680 1,250 1,250 1,250 1,250 14,994

2,340 CN 680 CN 250 CN 250 CN 250 CN 250 CN 4,020 CN

2,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 7,000 CR

2,174 CT 2,174 CT

1,800 SB 1,800 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

PHILADELPHIA NURSING HOME

49 EQUIPMENT AND RENOVATIONS - PHILADELPHIA NURSING HOME 1,900 1,900 1,900 1,900 1,900 1,900 11,400

1,900 CR 1,900 CR 1,900 CR 1,900 CR 1,900 CR 1,900 CR 11,400 CR

49A EQUIPMENT AND RENOVATIONS - PNH-FY 04 1,900 1,900

1,900 CR 1,900 CR

49B PNH EQUIPMENT AND RENOVATIONS-FY 03 1,900 1,900

1,900 CR 1,900 CR

49C PNH EQUIPMENT AND RENOVATIONS-FY 02 1,371 1,371

1,371 CR 1,371 CR

PHILADELPHIA NURSING HOME 7,071 1,900 1,900 1,900 1,900 1,900 16,571

7,071 CR 1,900 CR 1,900 CR 1,900 CR 1,900 CR 1,900 CR 16,571 CR

HEALTH 15,385 3,580 3,150 3,150 3,150 3,150 31,565

2,340 CN 680 CN 250 CN 250 CN 250 CN 250 CN 4,020 CN

9,071 CR 2,900 CR 2,900 CR 2,900 CR 2,900 CR 2,900 CR 23,571 CR

2,174 CT 2,174 CT

1,800 SB 1,800 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

HOUSING

HOUSING & COMMUNITY DEVEL - CAPITAL

49X SITE IMPROVEMENTS-FY 03 1,200 1,200

1,200 CT 1,200 CT

49Y SITE IMPROVEMENTS-FY 99 174 174

174 CT 174 CT

49Z SITE IMPROVEMENTS-FY 97 248 248

248 CT 248 CT

HOUSING & COMMUNITY DEVEL - CAPITAL 1,622 1,622

1,622 CT 1,622 CT

HOUSING 1,622 1,622

1,622 CT 1,622 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

HUMAN SERVICES

RIVERVIEW - CAPITAL

50 RIVERVIEW HOME RENOVATIONS 875 300 225 425 425 425 2,675

875 CN 300 CN 225 CN 425 CN 425 CN 425 CN 2,675 CN

50A RIVERVIEW HOME RENOVATIONS-FY 04 598 598

598 CT 598 CT

50B RIVERVIEW HOME RENOVATIONS-FY 03 50 50

50 CT 50 CT

50C RIVERVIEW HOME RENOVATIONS-FY 02 143 143

143 CT 143 CT

50D RIVERVIEW HOME RENOVATIONS-FY 01 137 137

137 CT 137 CT

50W NEW YOUTH STUDY CENTER-FY 04 18,000 18,000

18,000 TB 18,000 TB

50X NEW YOUTH STUDY CENTER-FY 98 33,211 33,211

7,154 CT 7,154 CT

26,057 TB 26,057 TB

50Y YOUTH STUDY CENTER-RENOVATIONS-FY 97 410 410

410 CT 410 CT

50Z YOUTH STUDY CENTER-RENOVATIONS-FY 96 1,478 1,478

1,478 CT 1,478 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

RIVERVIEW - CAPITAL 54,902 300 225 425 425 425 56,702

875 CN 300 CN 225 CN 425 CN 425 CN 425 CN 2,675 CN

9,970 CT 9,970 CT

44,057 TB 44,057 TB

HUMAN SERVICES 54,902 300 225 425 425 425 56,702

875 CN 300 CN 225 CN 425 CN 425 CN 425 CN 2,675 CN

9,970 CT 9,970 CT

44,057 TB 44,057 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

MANAGING DIRECTOR'S OFFICE

CAPITAL PROJECTS - VARIOUS

51 CITYWIDE FACILITIES 3,000 2,225 2,050 2,000 2,000 2,000 13,275

3,000 CN 2,225 CN 2,050 CN 2,000 CN 2,000 CN 2,000 CN 13,275 CN

51A CITYWIDE FACILITIES-FY 04 4,040 4,040

4,040 CT 4,040 CT

51B CITYWIDE FACILITIES-FY 03 3,211 3,211

3,211 CT 3,211 CT

51C CITYWIDE FACILITIES-FY 02 2,519 2,519

2,314 CT 2,314 CT

205 PB 205 PB

51D CITYWIDE FACILITIES-FY 01 1,920 1,920

1,624 CT 1,624 CT

296 PB 296 PB

51E CITYWIDE FACILITIES-FY 00 766 766

766 CT 766 CT

51F CITYWIDE FACILITIES-FY 99 580 580

580 CT 580 CT

51G FACILITIES IMPROVEMENTS-CITYWIDE-FY 98 602 602

602 CT 602 CT

51H FACILITIES IMPROVEMENTS-CITYWIDE-FY 97 309 309

309 CT 309 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

51I FACILITIES IMPROVEMENTS-CITYWIDE-FY 96 38 38

38 CT 38 CT

51J LOCAL MATCH FOR TRANSPORTATION GRANTS-FY 01 200 200

200 CT 200 CT

51K LOCAL MATCH FOR TRANSPORTATION GRANTS-FY 00 909 909

109 CT 109 CT

800 SB 800 SB

51L LOCAL MATCH FOR TRANSPORTATION GRANTS-FY 95 3,164 3,164

3,164 FB 3,164 FB

52 ENERGY STAR BUILDING UPGRADES 250 250 250 250 250 250 1,500

250 CN 250 CN 250 CN 250 CN 250 CN 250 CN 1,500 CN

52A ENERGY STAR BUILDING UPGRADES-FY 04 250 250

250 CT 250 CT

52B ENERGY STAR BUILDING UPGRADES-FY 03 250 250

250 CT 250 CT

52C ENERGY STAR BUILDING UPGRADES-FY 02 410 410

410 CT 410 CT

52D ENERGY STAR BUILDING UPGRADES-FY 01 112 112

112 CT 112 CT

52E ENERGY STAR BUILDING UPGRADES-FY 00 81 81

81 CT 81 CT

52F ENERGY COST REDUCTION PROGRAM-FY 99 31 31

31 CT 31 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

52G ENERGY COST REDUCTION PROGRAM-FY 98 244 244

244 CT 244 CT

52H ENERGY COST REDUCTION PROGRAM-FY 97 158 158

158 CT 158 CT

53 GREEN LIGHTS LIGHTING UPGRADES 250 250 250 250 250 250 1,500

250 CN 250 CN 250 CN 250 CN 250 CN 250 CN 1,500 CN

53A GREEN LIGHTS LIGHTING UPGRADES-FY 04 250 250

250 CT 250 CT

53B GREEN LIGHTS LIGHTING UPGRADES-FY 03 250 250

250 CT 250 CT

53C GREEN LIGHTS LIGHTING UPGRADES-FY 02 211 211

211 CT 211 CT

53D GREEN LIGHTS LIGHTING UPGRADES-FY 01 323 323

323 CT 323 CT

53E GREEN LIGHTS LIGHTING UPGRADES-FY 00 299 299

299 CT 299 CT

54 INTEGRATED CASE MANAGEMENT SYSTEM 1,500 1,500 1,000 4,000

1,500 CN 1,500 CN 1,000 CN 4,000 CN

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CAPITAL PROJECTS - VARIOUS 26,127 4,225 3,550 2,500 2,500 2,500 41,402 5,000 CN 4,225 CN 3,550 CN 2,500 CN 2,500 CN 2,500 CN 20,275 CN

16,662 CT 16,662 CT

3,164 FB 3,164 FB

501 PB 501 PB

800 SB 800 SB

MANAGING DIRECTOR'S OFFICE 26,127 4,225 3,550 2,500 2,500 2,500 41,402

5,000 CN 4,225 CN 3,550 CN 2,500 CN 2,500 CN 2,500 CN 20,275 CN

16,662 CT 16,662 CT

3,164 FB 3,164 FB

501 PB 501 PB

800 SB 800 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

MOIS

CAPITAL PROJECTS

55 DIGITAL ORTHOPHOTOGRAPHY, PLANIMETRIC, AND TOPOGRAPHIC 540 540 540 1,620

DATA 540 CN 540 CN 540 CN 1,620 CN

55A CITYWIDE GEOG INFO SYS (GIS) SERVER-FY 01 319 319

319 CT 319 CT

55B CITYWIDE GEOG INFO SYS (GIS) SERVER-FY 00 23 23

23 CT 23 CT

55C DIGITAL MAPPING DATA-FY 04 363 363

363 CT 363 CT

56 BUSINESS AND INFORMATION CONTINUITY/RECOVERY PROJECT 500 1,000 1,500

500 CN 1,000 CN 1,500 CN

56A INTEGRATED LIBRARY SYSTEMS-FY 04 644 644

644 CT 644 CT

CAPITAL PROJECTS 1,849 1,540 540 540 4,469 500 CN 1,540 CN 540 CN 540 CN 3,120 CN

1,349 CT 1,349 CT

MOIS 1,849 1,540 540 540 4,469

500 CN 1,540 CN 540 CN 540 CN 3,120 CN

1,349 CT 1,349 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

POLICE

POLICE FACILITIES

57 COMPUTER AND COMMUNICATION SYSTEM IMPROVEMENTS 1,140 1,000 1,000 1,000 1,000 1,000 6,140

1,140 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 6,140 CR

57A COMPUTER AND COMMUNICATION SYSTEM IMPS-FY 04 2,200 2,200

2,200 CR 2,200 CR

57B COMPUTER/COMMUNICATION SYSTEMS IMPS-FY 03 3,339 3,339

3,300 CR 3,300 CR

39 CT 39 CT

57C POLICE COMPUTER/COMMUNICATION SYS IMP-FY 02 1,331 1,331

1,331 CR 1,331 CR

58 POLICE DEPARTMENT INTERIOR AND EXTERIOR IMPROVEMENTS 640 500 400 400 400 400 2,740

640 CN 500 CN 400 CN 400 CN 400 CN 400 CN 2,740 CN

58A POLICE DEPT INTERIOR AND EXTERIOR IMPS-FY 04 1,092 1,092

1,092 CT 1,092 CT

58B POLICE FACIL INTERIOR & EXTERIOR IMPS-FY 03 1,210 1,210

510 CT 510 CT

700 SB 700 SB

58C POLICE DEPARTMENT - NEW FACILITIES-FY 01 270 270

270 CT 270 CT

58D HVAC AND MECHANICAL IMPROVEMENTS-FY 00 67 67

67 CT 67 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

POLICE FACILITIES 11,289 1,500 1,400 1,400 1,400 1,400 18,389 640 CN 500 CN 400 CN 400 CN 400 CN 400 CN 2,740 CN

7,971 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 12,971 CR

1,978 CT 1,978 CT

700 SB 700 SB

POLICE 11,289 1,500 1,400 1,400 1,400 1,400 18,389 640 CN 500 CN 400 CN 400 CN 400 CN 400 CN 2,740 CN

7,971 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 1,000 CR 12,971 CR

1,978 CT 1,978 CT

700 SB 700 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

PRISONS

CORRECTIONAL INSTITUTIONS - CAPITAL

59 PRISON SYSTEM - RENOVATIONS 1,575 500 500 400 500 500 3,975 1,575 CN 500 CN 500 CN 400 CN 500 CN 500 CN 3,975 CN

59A PRISON SYSTEM - RENOVATIONS-FY 04 2,450 2,450

2,450 CT 2,450 CT

59B PRISON SYSTEM - RENOVATIONS-FY 03 1,834 1,834

1,559 CT 1,559 CT

275 SB 275 SB

59C PRISON SYSTEM - RENOVATIONS-FY 02 194 194

161 A 161 A

33 CT 33 CT

59D PRISON FACILITIES - RENOVATIONS-FY 01 4,233 4,233

4,233 CT 4,233 CT

59E PRISON FACILITIES - RENOVATIONS-FY 00 36 36

36 CT 36 CT

59F PRISON FACILITIES - RENOVATIONS-FY 99 17 17

17 CT 17 CT

59G PRISON FACILITIES - RENOVATIONS-FY 98 15 15

15 CT 15 CT

59H PRISON FACILITIES - IMPROVEMENTS-FY 97 18 18

18 CT 18 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

59I PICC - RENOVATIONS-FY 96 467 467

467 CT 467 CT

59J WOMEN'S CORRECTIONAL FACILITY-FY 99 54 54

54 TB 54 TB

59K HOLMESBURG PRISON - DEACTIVATION-FY 96 272 272

272 CT 272 CT

CORRECTIONAL INSTITUTIONS - CAPITAL 11,165 500 500 400 500 500 13,565

161 A 161 A

1,575 CN 500 CN 500 CN 400 CN 500 CN 500 CN 3,975 CN

9,100 CT 9,100 CT

275 SB 275 SB

54 TB 54 TB

PRISONS 11,165 500 500 400 500 500 13,565

161 A 161 A

1,575 CN 500 CN 500 CN 400 CN 500 CN 500 CN 3,975 CN

9,100 CT 9,100 CT

275 SB 275 SB

54 TB 54 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

PUBLIC PROPERTY

BUILDINGS AND FACILITIES - OTHER

60 BUILDINGS AND FACILITIES IMPROVEMENTS 665 665

665 CN 665 CN

60A BUILDINGS AND FACILITIES IMPROVEMENTS-FY 04 25 25

25 CT 25 CT

60B CHINATOWN GATE RESTORATION-FY 01 31 31

31 CT 31 CT

60C EASTERN STATE PENITENTIARY RENOV-FY 99 4,100 4,100

644 CT 644 CT

3,456 PB 3,456 PB

60D LOCUST STREET CONCOURSE IMPROVEMENTS-FY 00 140 140

140 CT 140 CT

60E MARKET STREET EAST CONCOURSE IMPS-FY 96 96 96

96 CT 96 CT

60F MUNICIPAL BUILDINGS SECURITY-FY 03 6,223 6,223

6,223 CR 6,223 CR

60G PUBLIC CONCOURSE IMPROVEMENTS-FY 99 55 55

55 CT 55 CT

60H PUBLIC CONCOURSE/UNDERGROUND TUNNEL-FY 98 29 29

29 CT 29 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

60I TRANSIT FACILITIES IMPROVEMENTS-FY 04 4,276 4,276

1,593 CT 1,593 CT

2,220 FB 2,220 FB

463 SB 463 SB

60J TRANSIT FACILITIES IMPROVEMENTS-FY 03 300 300

300 CT 300 CT

60K TRANSIT FACILITIES IMPROVEMENTS-FY 02 881 881

|99|CT |99|CT

722 FB 722 FB

151 SB 151 SB

61 FAMILY COURT 1,000 1,000 300 300 300 300 3,200

1,000 CN 1,000 CN 300 CN 300 CN 300 CN 300 CN 3,200 CN

61A FAMILY COURT-FY 04 1,500 1,500

1,500 CT 1,500 CT

61B FAMILY COURT-FY 03 2,000 2,000

2,000 CT 2,000 CT

61C FAMILY COURT RENOVATIONS-FY 01 389 389

389 CT 389 CT

62 TRIPLEX FACILITY IMPROVEMENTS 200 200 200 200 200 200 1,200

200 CN 200 CN 200 CN 200 CN 200 CN 200 CN 1,200 CN

62A TRIPLEX FACILITY IMPROVEMENTS-FY 04 525 525

525 CT 525 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

62B TRIPLEX FACILITY IMPROVEMENTS-FY 03 170 170

170 CT 170 CT

62C TRIPLEX FACILITY IMPROVEMENTS-FY 02|99| |99|

|99|CT |99|CT

62D MUNICIPAL SERVICES BUILDING-FY 99 103 103

103 TB 103 TB

BUILDINGS AND FACILITIES - OTHER 22,711 1,200 500 500 500 500 25,911

1,865 CN 1,200 CN 500 CN 500 CN 500 CN 500 CN 5,065 CN

6,223 CR 6,223 CR

7,508 CT 7,508 CT

2,942 FB 2,942 FB

3,456 PB 3,456 PB

614 SB 614 SB

103 TB 103 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CITY HALL COMPLEX

63 CITY HALL 5,000 5,000 4,000 4,000 4,000 4,000 26,000 5,000 CN 5,000 CN 4,000 CN 4,000 CN 4,000 CN 4,000 CN 26,000 CN

63A CITY HALL-FY 04 5,000 5,000

5,000 CT 5,000 CT

63B CITY HALL-FY 03 3,207 3,207

3,207 CT 3,207 CT

63C CITY HALL RENOVATIONS-FY 01 59 59

59 CT 59 CT

63D CITY HALL RENOVATIONS-FY 00 138 138

138 CT 138 CT

63E CITY HALL RESTORATION-FY 95 1,860 1,860

1,860 A 1,860 A

63F CITY HALL RESTORATION-FY 94 406 406

406 A 406 A

CITY HALL COMPLEX 15,670 5,000 4,000 4,000 4,000 4,000 36,670 2,266 A 2,266 A

5,000 CN 5,000 CN 4,000 CN 4,000 CN 4,000 CN 4,000 CN 26,000 CN

8,404 CT 8,404 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

COMMUNICATIONS PROJECTS

64 COMMUNICATIONS SYSTEMS IMPROVEMENTS 5,500 5,500

200 CN 200 CN

5,300 CR 5,300 CR

64A COMMUNICATIONS IMPROVEMENTS-FY 04 2,800 2,800

2,800 CT 2,800 CT

64B COMMUNICATIONS-FY 03 117 117

67 CR 67 CR

50 CT 50 CT

64C TELECOMMUNICATION INFRASTRUCTURE UPGR-FY 02 300 300

300 CT 300 CT

64D TELECOMMUNICATION/INFRASTRUCTURE UPGR-FY 01 207 207

207 CT 207 CT

64E NEW CITYWIDE RADIO SYSTEM - 800 MHZ-FY 96 111 111

111 CT 111 CT

COMMUNICATIONS PROJECTS 9,035 9,035

200 CN 200 CN

5,367 CR 5,367 CR

3,468 CT 3,468 CT

PUBLIC PROPERTY 47,416 6,200 4,500 4,500 4,500 4,500 71,616

2,266 A 2,266 A

7,065 CN 6,200 CN 4,500 CN 4,500 CN 4,500 CN 4,500 CN 31,265 CN

11,590 CR 11,590 CR

19,380 CT 19,380 CT

2,942 FB 2,942 FB

3,456 PB 3,456 PB

614 SB 614 SB

103 TB 103 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

RECORDS

CAPITAL PROJECTS

64X LAN INFRASTRUCTURE-FY 00 47 47

47 CT 47 CT

64Y NETWORK INFRASTRUCT (CITY NET) DEVEL-FY 99 13 13

13 CT 13 CT

64Z ORTHOPHOTOGRAPHY MAPPING PROJECT-FY 00 115 115

115 CT 115 CT

CAPITAL PROJECTS 175 175

175 CT 175 CT

RECORDS 175 175

175 CT 175 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

RECREATION

CULTURAL FACILITIES

65 CULTURAL FACILITY IMPROVEMENTS 150 150

150 CN 150 CN

65A CULTURAL FACILITY IMPROVEMENTS-FY 04 1,540 1,540

540 CT 540 CT

1,000 PB 1,000 PB

65B CULTURAL FACILITIES-FY 03 600 600

600 CT 600 CT

65C CULTURAL FACILITIES-FY 02 86 86

86 CT 86 CT

65D CULTURAL FACILITIES-FY 01 162 162

162 CT 162 CT

65E CULTURAL FACILITIES-FY 00 190 190

190 CT 190 CT

65F CULTURAL FACILITIES-FY 99 2,034 2,034

1,034 CT 1,034 CT

1,000 PB 1,000 PB

65G CULTURAL FACILITIES-FY 98 108 108

108 CT 108 CT

65H ATWATER KENT MUSEUM - RENOVATIONS-FY 94 58 58

58 A 58 A

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CULTURAL FACILITIES 4,778 150 4,928

58 A 58 A

150 CN 150 CN

2,720 CT 2,720 CT

2,000 PB 2,000 PB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

ITEF - VARIOUS FACILITIES

66 GRANT FUNDED RECREATION IMPROVEMENTS 2,000 2,000 2,000 2,000 2,000 2,000 12,000

1,000 CN 1,000 CN 1,000 CN 1,000 CN 1,000 CN 1,000 CN 6,000 CN

1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 6,000 SB

66A GRANT FUNDED RECREATION IMPROVEMENTS-FY 04 2,000 2,000

1,000 CT 1,000 CT

1,000 SB 1,000 SB

66B STATE GRANT FUNDED RECREATION IMPS-FY 03 535 535

535 SB 535 SB

66C STATE GRANT FUNDED RECREATION IMPS-FY 02 3,030 3,030

65 CT 65 CT

890 FB 890 FB

2,075 SB 2,075 SB

66D STATE RECREATION GRANT - VARIOUS SITE-FY 96 50 50

50 SB 50 SB

67 IMPROVEMENTS TO EXISTING RECREATION FACILITIES 11,000 4,000 4,000 4,000 4,000 4,000 31,000

11,000 CN 4,000 CN 4,000 CN 4,000 CN 4,000 CN 4,000 CN 31,000 CN

67A IMPROVEMENTS TO EXISTING REC FACILITIES-FY 04 11,187 11,187

11,187 CT 11,187 CT

67B IMPRS TO EXISTING REC FACILITIES-FY 03 8,263 8,263

8,263 CT 8,263 CT

67C IMPROVEMENTS TO EXISTING REC FACIL-FY 02 7,017 7,017

7,017 CT 7,017 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

67D IMPS TO EXISTING REC FACILITIES-FY 01 4,401 4,401

4,401 CT 4,401 CT

67E ITEF - SITE IMPROVEMENTS-FY 00 4,694 4,694

4,694 CT 4,694 CT

67F IMPROVEMENTS TO EXISTING FACILITIES-FY 99 3,241 3,241

3,241 CT 3,241 CT

67G IMPROVEMENTS TO EXISTING FACILITIES-FY 98 1,384 1,384

1,384 CT 1,384 CT

67H IMPROVEMENTS TO EXISTING FACILITIES-FY 97 140 140

140 CT 140 CT

67I IMPROVEMENTS TO EXISTING FACILITIES-FY 96 211 211

211 CT 211 CT

67J IMPROVEMENTS TO EXISTING FACILITIES-FY 95 708 708

708 CT 708 CT

67K IMPROVEMENTS TO EXISTING FACILITIES-FY 94 108 108

108 A 108 A

67L CIONE PG - REMEDIATION & IMPROVEMENTS-FY 01 368 368

368 PB 368 PB

67M NEW NORTHEAST COMMUNITY CENTER-FY 00 2,219 2,219

1,219 CT 1,219 CT

1,000 SB 1,000 SB

67N LONNIE YOUNG RECREATION CENTER-FY 99 500 500

500 SB 500 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

68 IMPROVEMENTS TO EXISTING RECREATION FACILITIES -

INFRASTRUCTURE 150 150 100 100 100 100 700

150 CN 150 CN 100 CN 100 CN 100 CN 100 CN 700 CN

68A IMPS TO EXISTING FACIL - INFRASTRUCTURE-FY 04 200 200

200 CT 200 CT

68B ITEF - INFRASTRUCTURE-FY 03 144 144

144 CT 144 CT

68C ITEF - INFRASTRUCTURE-FY 02 44 44

44 CT 44 CT

68D ITEF - BUILDING RENOVATIONS-FY 95 30 30

30 A 30 A

68E ITEF - OUTDOOR LIGHTING-FY 95|99| |99|

|99|CT |99|CT

68F ITEF - SITE RENOVATIONS-FY 95 115 115

65 A 65 A

50 CT 50 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

68G ITEF - SITE RENOVATIONS-FY 94 105 105

105 A 105 A

68H ADMIN, DESIGN & ENGINEERING - REC-FY 02 320 320

270 CT 270 CT

50 PB 50 PB

68I ADMIN, DESIGN & ENGINEERING - REC-FY 01 775 775

775 CT 775 CT

68J ADMIN, DESIGN & ENGINEERING - REC-FY 00 304 304

304 CT 304 CT

68K ADMINISTRATION, DESIGN & ENGINEERING-FY 99 394 394

394 CT 394 CT

69 IMPROVEMENTS TO EXISTING RECREATION FACILITIES -

SWIMMING POOLS 500 500 500 500 500 500 3,000

500 CN 500 CN 500 CN 500 CN 500 CN 500 CN 3,000 CN

69A IMPS TO EXISTING REC FACIL - POOLS-FY 04 500 500

500 CT 500 CT

69B IMP TO EXISTING REC FACIL - POOLS-FY 03 50 50

50 CT 50 CT

69C ITEF - SWIMMING POOLS-FY 02 900 900

900 CT 900 CT

69D ITEF-SWIMMING POOL RENOVATIONS-FY 95 100 100

100 A 100 A

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

69E ITEF-SWIMMING POOL RENOVATIONS-FY 94 56 56

56 A 56 A

70 IMPROVEMENTS TO EXISTING RECREATION FACILITIES -

LIFE SAFETY SYSTEMS 300 300 300 300 300 300 1,800

300 CN 300 CN 300 CN 300 CN 300 CN 300 CN 1,800 CN

70A IMPS TO EXISTING FACIL - LIFE SAFETY SYS-FY 04 400 400

400 CT 400 CT

70B ITEF - LIFE SAFETY SYSTEMS-FY 03 399 399

399 CT 399 CT

70C ITEF-FIRE SAFETY SECURITY SYSTEMS-FY 95|99| |99|

|99|A |99|A

70D ITEF-FIRE SAFETY SECURITY SYSTEMS-FY 94 300 300

300 A 300 A

71 ICE RINK RENOVATIONS 600 600

600 CN 600 CN

71A ICE RINK RENOVATIONS-FY 04 500 500

500 CT 500 CT

71B ICE RINK RENOVATIONS-FY 02 500 500

500 CT 500 CT

71C ICE RINK RENOVATIONS-FY 01 550 550

550 CT 550 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

ITEF - VARIOUS FACILITIES 71,302 6,950 6,900 6,900 6,900 6,900 105,852

770 A 770 A

13,550 CN 5,950 CN 5,900 CN 5,900 CN 5,900 CN 5,900 CN 43,100 CN

49,514 CT 49,514 CT

890 FB 890 FB

418 PB 418 PB

6,160 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 11,160 SB

RECREATION 76,080 7,100 6,900 6,900 6,900 6,900 110,780

828 A 828 A

13,550 CN 6,100 CN 5,900 CN 5,900 CN 5,900 CN 5,900 CN 43,250 CN

52,234 CT 52,234 CT

890 FB 890 FB

2,418 PB 2,418 PB

6,160 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 1,000 SB 11,160 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

STREETS

BRIDGES

72 BRIDGE RECONSTRUCTION & IMPROVEMENTS 6,142 29,530 45,900 4,100 9,200 10,200 105,072

602 CN 3,126 CN 4,540 CN 360 CN 870 CN 970 CN 10,468 CN

4,676 FB 22,628 FB 34,924 FB 3,156 FB 7,032 FB 7,792 FB 80,208 FB

864 SB 3,776 SB 6,436 SB 584 SB 1,298 SB 1,438 SB 14,396 SB

72A BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 04 4,350 4,350

385 CT 385 CT

3,346 FB 3,346 FB

619 SB 619 SB

72B BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 03 5,792 5,792

1,088 CT 1,088 CT

3,969 FB 3,969 FB

735 SB 735 SB

72C BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 02 7,912 7,912

744 CT 744 CT

5,821 FB 5,821 FB

172 PB 172 PB

1,175 SB 1,175 SB

72D BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 01 1,725 1,725

1,407 FB 1,407 FB

66 PB 66 PB

252 SB 252 SB

72E BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 00 5,382 5,382

4,372 FB 4,372 FB

225 PB 225 PB

785 SB 785 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

72F BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 99 924 924

787 FB 787 FB

|99|PB |99|PB

131 SB 131 SB

72G BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 98 602 602

64 CT 64 CT

469 FB 469 FB

69 SB 69 SB

72H BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 97 260 260

130 PB 130 PB

130 SB 130 SB

72I BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 96 99 99

83 FB 83 FB

16 SB 16 SB

72J BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 95 480 480

12 A 12 A

303 FB 303 FB

112 PB 112 PB

53 SB 53 SB

72K BRIDGE RECONSTRUCTION & IMPROVEMENTS-FY 94 4,017 4,017

29 A 29 A

2,928 FB 2,928 FB

1,060 SB 1,060 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

BRIDGES 37,685 29,530 45,900 4,100 9,200 10,200 136,615

41 A 41 A

602 CN 3,126 CN 4,540 CN 360 CN 870 CN 970 CN 10,468 CN

2,281 CT 2,281 CT

28,161 FB 22,628 FB 34,924 FB 3,156 FB 7,032 FB 7,792 FB 103,693 FB

711 PB 711 PB

5,889 SB 3,776 SB 6,436 SB 584 SB 1,298 SB 1,438 SB 19,421 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

GRADING & PAVING

73 RECONSTRUCTION/RESURFACING OF STREETS 11,000 10,000 8,000 8,000 8,000 8,000 53,000

11,000 CN 10,000 CN 8,000 CN 8,000 CN 8,000 CN 8,000 CN 53,000 CN

73A RECONSTRUCTION/RESURFACING OF STREETS-FY 04 7,452 7,452

7,452 CT 7,452 CT

73B RECONSTRUCTION/RESURFACING OF STREETS-FY 03 3,412 3,412

3,412 CT 3,412 CT

73C RECONSTRUCTION/RESURFACING OF STREETS-FY 02 1,020 1,020

1,020 CT 1,020 CT

73D RECONSTRUCTION/RESURFACING OF STREETS-FY 01 669 669

669 CT 669 CT

73E RECONSTRUCTION/RESURFACING OF STREETS-FY 00 200 200

200 CT 200 CT

73F RECONSTRUCTION/RESURF OF STREETS-FY 99 100 100

100 CT 100 CT

73G STADIUM COMPLEX - ROADWAY IMPS-FY 03 1,111 1,111

826 A 826 A

285 PB 285 PB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

74 HISTORIC STREETS 200 200 200 200 200 200 1,200

200 CN 200 CN 200 CN 200 CN 200 CN 200 CN 1,200 CN

GRADING & PAVING 25,164 10,200 8,200 8,200 8,200 8,200 68,164

826 A 826 A

11,200 CN 10,200 CN 8,200 CN 8,200 CN 8,200 CN 8,200 CN 54,200 CN

12,853 CT 12,853 CT

285 PB 285 PB

IMPROVEMENTS TO CITY HIGHWAYS

75 CENTER CITY TRAFFIC SIGNALS - PHASE 2 3,510 3,510 7,020

10 CN 10 CN 20 CN

3,500 FB 3,500 FB 7,000 FB

75A CENTER CITY TRAFFIC SIGNALS - PHASE 2-FY 04 3,200 3,200

3,200 FB 3,200 FB

75B CENTER CITY TRAFFIC SIGNALS - PHASE 2-FY 02 5,150 5,150

350 CT 350 CT

4,800 FB 4,800 FB

75C CENTER CITY SIGNAL IMPROVEMENTS-FY 96 170 170

170 CT 170 CT

76 "FOREVER GREEN" PROGRAM 40 40 40 40 40 40 240

40 CN 40 CN 40 CN 40 CN 40 CN 40 CN 240 CN

77 FEDERAL AID HIGHWAY PROGRAM 14,810 8,910 8,805 8,880 7,500 7,700 56,605

3,710 CN 2,310 CN 2,305 CN 2,380 CN 1,200 CN 1,200 CN 13,105 CN

10,700 FB 6,100 FB 6,000 FB 6,000 FB 5,800 FB 6,000 FB 40,600 FB

400 SB 500 SB 500 SB 500 SB 500 SB 500 SB 2,900 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

77A FEDERAL AID HIGHWAY PROGRAM-FY 04 8,750 8,750

1,910 CT 1,910 CT

6,440 FB 6,440 FB

400 SB 400 SB

77B FEDERAL AID HIGHWAY PROGRAM-FY 03 7,433 7,433

1,433 CT 1,433 CT

5,750 FB 5,750 FB

250 SB 250 SB

77C FEDERAL AID HIGHWAY PROGRAM-FY 02 10,004 10,004

1,499 CT 1,499 CT

8,505 FB 8,505 FB

77D FEDERAL AID HIGHWAY PROGRAM-FY 01 7,217 7,217

585 CT 585 CT

6,632 FB 6,632 FB

77E FEDERAL AID HIGHWAY PROGRAM-FY 99 851 851

53 CT 53 CT

798 FB 798 FB

77F FEDERAL AID HIGHWAY PROGRAM-FY 98 738 738

738 FB 738 FB

77G FEDERAL AID HIGHWAY PROGRAM-FY 97 1,798 1,798

1,422 FB 1,422 FB

376 SB 376 SB

77H FEDERAL AID HIGHWAY PROGRAM-FY 96 2,068 2,068

162 CT 162 CT

1,906 FB 1,906 FB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

77I FEDERAL AID HIGHWAY PROGRAM-FY 95 3,821 3,821

155 A 155 A

1,092 FB 1,092 FB

2,574 SB 2,574 SB

77J 26TH STREET GATEWAY IMPROVEMENTS-FY 94 100 100

100 A 100 A

77K AVENUE OF THE ARTS - N. BROAD STREET-FY 03 3,500 3,500

3,500 FB 3,500 FB

77L BICYCLE NETWORK PLAN-FY 01 312 312

11 CT 11 CT

301 FB 301 FB

77M BROAD & ERIE SUBWAY - INTERMODAL IMPS-FY 02 3,300 3,300

420 CT 420 CT

2,880 FB 2,880 FB

77N BROAD & ERIE SUBWAY - INTERMODAL IMPS-FY 00 1,649 1,649

29 CT 29 CT

1,440 FB 1,440 FB

180 SB 180 SB

77O ERIE SUBWAY STATION - INTERMODAL IMP-FY 94 147 147

91 FB 91 FB

56 SB 56 SB

77P DELAWARE AVE EXTENSION - BRIDESBURG-FY 00 4,858 4,858

478 CT 478 CT

3,892 FB 3,892 FB

488 SB 488 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

77Q INDEPENDENCE MALL GATEWAY-FY 03 3,108 3,108

3,108 FB 3,108 FB

77R INDEPENDENCE MALL GATEWAY-FY 02 2,197 2,197

2,197 FB 2,197 FB

77S INDEPENDENCE MALL GATEWAY-FY 01 1,836 1,836

204 CT 204 CT

1,332 FB 1,332 FB

300 TB 300 TB

77T MAIN ST/RIDGE AVE - INTERSECTION IMPS-FY 01 564 564

564 CT 564 CT

77U MAIN STREET/RIDGE AVENUE-FY 98 100 100

100 CT 100 CT

77V PHILADELPHIA AUTO MALL - IMPROVEMENTS-FY 03 927 927

927 PB 927 PB

77W PHILADELPHIA AUTO MALL - IMPROVEMENTS-FY 02 1,300 1,300

1,300 CT 1,300 CT

77X SCHUYLKILL RIVER PARK-FY 98 51 51

40 CT 40 CT

11 FB 11 FB

77Y WESTBANK GREENWAY-FY 02 2,300 2,300

460 CT 460 CT

1,840 FB 1,840 FB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

77Z WESTBANK GREENWAY-FY 00 662 662

108 CT 108 CT

554 FB 554 FB

IMPROVEMENTS TO CITY HIGHWAYS 96,471 12,460 8,845 8,920 7,540 7,740 141,976

255 A 255 A

3,760 CN 2,360 CN 2,345 CN 2,420 CN 1,240 CN 1,240 CN 13,365 CN

9,876 CT 9,876 CT

76,629 FB 9,600 FB 6,000 FB 6,000 FB 5,800 FB 6,000 FB 110,029 FB

927 PB 927 PB

4,724 SB 500 SB 500 SB 500 SB 500 SB 500 SB 7,224 SB

300 TB 300 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

SANITATION

78 MODERNIZATION OF SANITATION FACILITIES 980 795 140 160 480 2,555

980 CN 795 CN 140 CN 160 CN 480 CN 2,555 CN

78A MODERNIZATION OF SANITATION FAC-FY 04 377 377

377 CT 377 CT

78B MODERNIZATION OF SANITATION FAC-FY 03 51 51

51 CT 51 CT

78C SANITATION FACILITIES - MODERNIZATION-FY 02|99| |99|

|99|CT |99|CT

78D SANITATION FACILITIES-FY 99 60 60

60 CT 60 CT

78E SANITATION FACILITIES-IMPROVEMENTS-FY 98|99| |99|

|99|CT |99|CT

SANITATION 1,477 795 140 160 480 3,052

980 CN 795 CN 140 CN 160 CN 480 CN 2,555 CN

497 CT 497 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

STREET LIGHTING

79 STREET LIGHTING IMPROVEMENTS 1,250 1,250 1,250 1,250 1,250 1,250 7,500

250 CN 250 CN 250 CN 250 CN 250 CN 250 CN 1,500 CN

1,000 FB 1,000 FB 1,000 FB 1,000 FB 1,000 FB 1,000 FB 6,000 FB

79A STREET LIGHTING IMPROVEMENTS-FY 03 850 850

250 CT 250 CT

600 SB 600 SB

79B STREET LIGHTING-FY 02 641 641

641 CT 641 CT

79C STREET LIGHTING-FY 97 100 100

100 CT 100 CT

79D KELLY DRIVE STREET LIGHT MODERNIZ-FY 98 111 111

96 FB 96 FB

15 SB 15 SB

STREET LIGHTING 2,952 1,250 1,250 1,250 1,250 1,250 9,202

250 CN 250 CN 250 CN 250 CN 250 CN 250 CN 1,500 CN

991 CT 991 CT

1,096 FB 1,000 FB 1,000 FB 1,000 FB 1,000 FB 1,000 FB 6,096 FB

615 SB 615 SB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

STREETS DEPARTMENT FACILITIES

80 STREETS DEPARTMENT SUPPORT FACILITIES 185 185 50 50 50 50 570

185 CN 185 CN 50 CN 50 CN 50 CN 50 CN 570 CN

80A STREETS DEPARTMENT SUPPORT FACILITIES-FY 04 390 390

390 CT 390 CT

80B STREETS DEPARTMENT SUPPORT FACILITIES-FY 03 410 410

410 CT 410 CT

80C STREETS DEPARTMENT SUPPORT FACILITIES-FY 02 16 16

16 CT 16 CT

80D STREETS DEPT SUPPORT FACIL - RENOV-FY 00 67 67

67 CT 67 CT

80E STREETS DEPT SUPPORT FACIL - RENOV-FY 99 10 10

10 CT 10 CT

STREETS DEPARTMENT FACILITIES 1,078 185 50 50 50 50 1,463

185 CN 185 CN 50 CN 50 CN 50 CN 50 CN 570 CN

893 CT 893 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

TRAFFIC ENGINEERING IMPS

81 SCHOOL/PEDESTRIAN CROSSING SIGNS AND SIGNALS 200 200 60 60 60 60 640

200 CN 200 CN 60 CN 60 CN 60 CN 60 CN 640 CN

81A SCHOOL/PEDESTRIAN CROSSING SIGNS/SIGNALS-FY 04 300 300

300 CT 300 CT

82 TRAFFIC CONTROL 1,050 1,000 950 950 950 950 5,850

1,050 CN 1,000 CN 950 CN 950 CN 950 CN 950 CN 5,850 CN

82A TRAFFIC CONTROL-FY 04 827 827

827 CT 827 CT

82B TRAFFIC CONTROL-FY 03 38 38

38 CT 38 CT

82C TRAFFIC CONTROL-FY 02 45 45

45 CT 45 CT

82D TRAFFIC CONTROL-FY 01|99| |99|

|99|CT |99|CT

82E TRAFFIC CONTROL-FY 97 611 611

148 CT 148 CT

463 FB 463 FB

82F CONVERTING TO LED SIGNAL INDICATIONS-FY 04 750 750

225 CR 225 CR

525 FB 525 FB

82G REPLACING LED SIGNAL INDICATIONS-FY 04 375 375

375 CR 375 CR

82H FLRSCNT YELLOW-GREEN SCHOOL/PED SIGNS-FY 03 43 43

43 CT 43 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

TRAFFIC ENGINEERING IMPS 4,241 1,200 1,010 1,010 1,010 1,010 9,481

1,250 CN 1,200 CN 1,010 CN 1,010 CN 1,010 CN 1,010 CN 6,490 CN

600 CR 600 CR

1,403 CT 1,403 CT

988 FB 988 FB

STREETS 169,068 55,620 65,395 23,690 27,250 28,930 369,953

1,122 A 1,122 A

18,227 CN 18,116 CN 16,535 CN 12,450 CN 11,620 CN 12,200 CN 89,148 CN

600 CR 600 CR

28,794 CT 28,794 CT

106,874 FB 33,228 FB 41,924 FB 10,156 FB 13,832 FB 14,792 FB 220,806 FB

1,923 PB 1,923 PB

11,228 SB 4,276 SB 6,936 SB 1,084 SB 1,798 SB 1,938 SB 27,260 SB

300 TB 300 TB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

TRANSIT

TRANSIT IMPROVEMENTS - SEPTA

83 SEPTA BRIDGE, TRACK, SIGNAL, AND INFRASTRUCTURE

IMPROVEMENTS 133,916 135,667 95,539 89,270 161,949 127,031 743,372

3,948 CN 3,934 CN 3,082 CN 2,927 CN 4,615 CN 3,104 CN 21,610 CN

91,760 FO 90,134 FO 70,191 FO 66,790 FO 103,988 FO 68,052 FO 490,915 FO

37,702 SO 40,977 SO 22,150 SO 19,505 SO 52,562 SO 54,743 SO 227,639 SO

506 TO 622 TO 116 TO 48 TO 784 TO 1,132 TO 3,208 TO

83A SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 04 4,209 4,209

4,209 CT 4,209 CT

83B SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 03 387 387

387 CT 387 CT

83C SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 02|99| |99|

|99|CT |99|CT

83D SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 01 26 26

26 CT 26 CT

83E SEPTA BRIDGE/TRACK/SIGNAL/INFRASTRU IMPS-FY 00 10 10

10 CT 10 CT

83F SEPTA INFRASTRUCTURE IMPROVEMENTS-FY 98 269 269

269 CT 269 CT

83G SEPTA INFRASTRUCTURE IMPROVEMENTS -FY 97 698 698

698 CT 698 CT

83H SEPTA SUPPORT FACILITIES IMPS-FY 98 56 56

56 CT 56 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

83I SEPTA SUPPORT FACILITIES IMPS-FY 96 56 56

56 CT 56 CT

84 SEPTA STATION AND PARKING IMPROVEMENTS 41,257 40,918 13,624 23,400 30,113 31,733 181,045

1,266 CN 1,235 CN 400 CN 780 CN 1,003 CN 1,059 CN 5,743 CN

33,006 FO 32,734 FO 10,899 FO 18,720 FO 24,091 FO 25,386 FO 144,836 FO

6,875 SO 6,819 SO 2,272 SO 3,900 SO 5,019 SO 5,288 SO 30,173 SO

110 TO 130 TO 53 TO 293 TO

84A SEPTA STATION & PARKING IMPROVEMENTS-FY 04 789 789

789 CT 789 CT

84B SEPTA STATION & PARKING IMPROVEMENTS-FY 03 208 208

208 CT 208 CT

84C SEPTA STATION & PARKING IMPROVEMENTS-FY 00 17 17

17 CT 17 CT

84D SEPTA STATION & PARKING IMPROVEMENTS-FY 97 12 12

12 CT 12 CT

85 SEPTA VEHICLE/EQUIPMENT ACQUISITION AND

IMPROVEMENT PROGRAM 19,782 73,126 116,146 109,885 22,504 22,470 363,913

509 CN 1,749 CN 2,847 CN 2,714 CN 560 CN 659 CN 9,038 CN

12,017 FO 54,901 FO 90,117 FO 85,108 FO 15,203 FO 15,176 FO 272,522 FO

7,106 SO 15,790 SO 22,161 SO 21,117 SO 6,551 SO 6,545 SO 79,270 SO

150 TO 686 TO 1,021 TO 946 TO 190 TO 90 TO 3,083 TO

85A SEPTA VEHICLE/EQUIP ACQUISITION/IMP PROG-FY 04 388 388

388 CT 388 CT

85B SEPTA BUS/RAIL VEH/EQUIP ACQ/OVRHL PR-FY 02 17 17

17 CT 17 CT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

85C SEPTA BUS/RAIL VEHICLE/EQUIP ACQ PROG-FY 01|99| |99|

|99|CT |99|CT

85D SEPTA VEHICLE/EQUIPMENT ACQUIS PROG-FY 99 25 25

25 CT 25 CT

85E SEPTA VEHICLE/EQUIPMENT ACQUIS PROG-FY 98 1,762 1,762

1,762 CT 1,762 CT

85F SEPTA VEHICLE/EQUIPMENT ACQUIS PROG-FY 97 23 23

23 CT 23 CT

86 SEPTA PASSENGER INFORMATION, COMMUNICATIONS, AND

SYSTEM CONTROLS 3,000 7,856 3,834 14,690

57 CN 155 CN 98 CN 310 CN

2,400 FO 6,028 FO 2,810 FO 11,238 FO

500 SO 1,566 SO 896 SO 2,962 SO

43 TO 107 TO 30 TO 180 TO

86A SEPTA PASSEN INFO/COMMUN/SYS CON IMPS-FY 03 95 95

95 CT 95 CT

86B SEPTA PASSEN INFO/COMMUN/SYS CON IMPS-FY 01 36 36

36 CT 36 CT

TRANSIT IMPROVEMENTS - SEPTA 207,040 257,567 229,143 222,555 214,566 181,234 1,312,105

5,780 CN 7,073 CN 6,427 CN 6,421 CN 6,178 CN 4,822 CN 36,701 CN

9,085 CT 9,085 CT

139,183 FO 183,797 FO 174,017 FO 170,618 FO 143,282 FO 108,614 FO 919,511 FO

52,183 SO 65,152 SO 47,479 SO 44,522 SO 64,132 SO 66,576 SO 340,044 SO

809 TO 1,545 TO 1,220 TO 994 TO 974 TO 1,222 TO 6,764 TO

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

TRANSIT 207,040 257,567 229,143 222,555 214,566 181,234 1,312,105

5,780 CN 7,073 CN 6,427 CN 6,421 CN 6,178 CN 4,822 CN 36,701 CN

9,085 CT 9,085 CT

139,183 FO 183,797 FO 174,017 FO 170,618 FO 143,282 FO 108,614 FO 919,511 FO

52,183 SO 65,152 SO 47,479 SO 44,522 SO 64,132 SO 66,576 SO 340,044 SO

809 TO 1,545 TO 1,220 TO 994 TO 974 TO 1,222 TO 6,764 TO

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

WATER

COLLECTOR SYSTEMS - CAPITAL

87 IMPROVEMENTS TO COLLECTOR SYSTEM 24,510 22,660 22,660 22,660 22,660 22,660 137,810

10 PB 10 PB 10 PB 10 PB 10 PB 10 PB 60 PB

24,000 XN 22,150 XN 22,150 XN 22,150 XN 22,150 XN 22,150 XN 134,750 XN

500 XR 500 XR 500 XR 500 XR 500 XR 500 XR 3,000 XR

87A COLLECTOR SYSTEM-FY 04 24,000 24,000

500 XR 500 XR

23,500 XT 23,500 XT

87B COLLECTOR SYSTEM-FY 03 8,738 8,738

500 XR 500 XR

8,238 XT 8,238 XT

87C COLLECTOR SYSTEM-FY 02 91 91

91 XT 91 XT

87D RECONSTRUCTION OF COLLECTOR SYSTEM-FY 01 222 222

222 XT 222 XT

87E RECONSTRUCTION OF COLLECTOR SYSTEM-FY 00 41 41

41 XT 41 XT

88 STORM FLOOD RELIEF / COMBINED SEWER OVERFLOW 4,000 4,000 4,000 4,000 4,000 4,000 24,000

4,000 XN 4,000 XN 4,000 XN 4,000 XN 4,000 XN 4,000 XN 24,000 XN

88A STORM FLOOD RELIEF/COMB SEWER OVRFLO-FY 04 4,000 4,000

4,000 XT 4,000 XT

88B STORM FLOOD RELIEF/COMB SEWER OVRFLO-FY 03 4,000 4,000

4,000 XT 4,000 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

88C STORM FLOOD RELIEF-FY 02 6,000 6,000

6,000 XT 6,000 XT

88D STORM FLOOD RELIEF-FY 01 2,764 2,764

2,764 XT 2,764 XT

88E STORM FLOOD RELIEF-FY 00 5,829 5,829

5,829 XT 5,829 XT

88F STORM FLOOD RELIEF-FY 99 8,589 8,589

8,589 XT 8,589 XT

88G STORM FLOOD RELIEF-FY 98 5,046 5,046

5,046 XT 5,046 XT

COLLECTOR SYSTEMS - CAPITAL 97,830 26,660 26,660 26,660 26,660 26,660 231,130

10 PB 10 PB 10 PB 10 PB 10 PB 10 PB 60 PB

28,000 XN 26,150 XN 26,150 XN 26,150 XN 26,150 XN 26,150 XN 158,750 XN

1,500 XR 500 XR 500 XR 500 XR 500 XR 500 XR 4,000 XR

68,320 XT 68,320 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CONVEYANCE SYSTEMS - CAPITAL

89 IMPROVEMENTS TO CONVEYANCE SYSTEM 21,930 21,930 21,930 21,930 21,930 21,930 131,580

10 PB 10 PB 10 PB 10 PB 10 PB 10 PB 60 PB

21,420 XN 21,420 XN 21,420 XN 21,420 XN 21,420 XN 21,420 XN 128,520 XN

500 XR 500 XR 500 XR 500 XR 500 XR 500 XR 3,000 XR

89A CONVEYANCE SYSTEM-FY 04 21,620 21,620

500 XR 500 XR

21,120 XT 21,120 XT

89B CONVEYANCE SYSTEM-FY 03 7,449 7,449

500 XR 500 XR

6,949 XT 6,949 XT

89C CONVEYANCE SYSTEM-FY 02 1,103 1,103

1,103 XT 1,103 XT

89D RECONSTRUCTION OF CONVEYANCE SYSTEM-FY 01 778 778

778 XT 778 XT

89E RECONSTRUCTION OF CONVEYANCE SYSTEM-FY 00 16 16

16 XT 16 XT

89F EXPANSION OF CONVEYANCE SYSTEM-FY 00 51 51

51 XT 51 XT

89G LARGE METER REPLACEMENT-FY 04 13 13

13 XT 13 XT

89H LARGE METER REPLACEMENT-FY 03 300 300

300 XT 300 XT

89I LARGE METER REPLACEMENT-FY 02 35 35

35 XT 35 XT

89J LARGE METER REPLACEMENT-FY 01|99| |99|

|99|XT |99|XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

CONVEYANCE SYSTEMS - CAPITAL 53,301 21,930 21,930 21,930 21,930 21,930 162,951

10 PB 10 PB 10 PB 10 PB 10 PB 10 PB 60 PB

21,420 XN 21,420 XN 21,420 XN 21,420 XN 21,420 XN 21,420 XN 128,520 XN

1,500 XR 500 XR 500 XR 500 XR 500 XR 500 XR 4,000 XR

30,371 XT 30,371 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

GENERAL - CAPITAL

90 ENGINEERING AND ADMINISTRATION 18,604 19,270 19,899 20,496 21,111 21,745 121,125

17,122 XN 17,744 XN 18,276 XN 18,824 XN 19,389 XN 19,971 XN 111,326 XN

1,482 XR 1,526 XR 1,623 XR 1,672 XR 1,722 XR 1,774 XR 9,799 XR

90A GIS-FY 99 2,415 2,415

2,415 XT 2,415 XT

91 VEHICLES 4,000 4,000 4,000 4,000 4,000 4,000 24,000

4,000 XR 4,000 XR 4,000 XR 4,000 XR 4,000 XR 4,000 XR 24,000 XR

91A VEHICLES-FY 04 1,464 1,464

1,464 XR 1,464 XR

91B VEHICLES-FY 03 3,698 3,698

3,698 XR 3,698 XR

91C VEHICLES-FY 02 268 268

268 XR 268 XR

GENERAL - CAPITAL 30,449 23,270 23,899 24,496 25,111 25,745 152,970

17,122 XN 17,744 XN 18,276 XN 18,824 XN 19,389 XN 19,971 XN 111,326 XN

10,912 XR 5,526 XR 5,623 XR 5,672 XR 5,722 XR 5,774 XR 39,229 XR

2,415 XT 2,415 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

TREATMENT FACILITIES - CAPITAL

92 IMPROVEMENTS TO TREATMENT FACILITIES 46,000 42,000 42,000 42,000 42,000 42,000 256,000

36,153 XN 31,978 XN 31,875 XN 31,724 XN 31,574 XN 31,426 XN 194,730 XN

9,847 XR 10,022 XR 10,125 XR 10,276 XR 10,426 XR 10,574 XR 61,270 XR

92A IMPROVEMENTS TO TREATMENT FACILITIES-FY 04 48,440 48,440

9,645 XR 9,645 XR

38,795 XT 38,795 XT

92B IMPROVEMENTS TO TREATMENT FACILITIES-FY 03 14,182 14,182

362 XR 362 XR

13,820 XT 13,820 XT

92C IMPROVEMENTS TO TREATMENT FACILITIES-FY 02 539 539

48 XR 48 XR

491 XT 491 XT

92D IMPROVEMENTS TO TREATMENT FACILITIES-FY 01 350 350

250 XR 250 XR

100 XT 100 XT

92E IMPROVEMENTS TO TREATMENT FACILITIES-FY 00 2,440 2,440

2,440 XT 2,440 XT

92F IMPROVEMENTS TO TREATMENT FACILITIES-FY 99 323 323

323 XT 323 XT

92G IMPROVEMENTS TO TREATMENT FACILITIES-FY 97|99| |99|

|99|XT |99|XT

TREATMENT FACILITIES - CAPITAL 112,280 42,000 42,000 42,000 42,000 42,000 322,280

36,153 XN 31,978 XN 31,875 XN 31,724 XN 31,574 XN 31,426 XN 194,730 XN

20,152 XR 10,022 XR 10,125 XR 10,276 XR 10,426 XR 10,574 XR 71,575 XR

55,975 XT 55,975 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

WATER 293,860 113,860 114,489 115,086 115,701 116,335 869,331

20 PB 20 PB 20 PB 20 PB 20 PB 20 PB 120 PB

102,695 XN 97,292 XN 97,721 XN 98,118 XN 98,533 XN 98,967 XN 593,326 XN

34,064 XR 16,548 XR 16,748 XR 16,948 XR 17,148 XR 17,348 XR 118,804 XR

157,081 XT 157,081 XT

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

ZOOLOGICAL GARDENS

PHILADELPHIA ZOO - CAPITAL

92U PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 04 11,555 11,555

1,560 CT 1,560 CT

9,995 PB 9,995 PB

92V PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 03 3,778 3,778

1,268 CT 1,268 CT

2,510 PB 2,510 PB

92W PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 02 1,078 1,078

1,048 CT 1,048 CT

30 PB 30 PB

92X PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 01 268 268

268 CT 268 CT

92Y PHILA ZOO FACILITY & INFRASTRUCTURE IMPS-FY 00 31 31

31 CT 31 CT

92Z PHILA ZOO FACILITIES/UTILITIES- IMPS-FY 99|99| |99|

|99|CT |99|CT

PHILADELPHIA ZOO - CAPITAL 16,714 16,714

4,179 CT 4,179 CT

12,535 PB 12,535 PB

2005 2006 2007 2008 2009 2010 2005 - 2010

$x000 $x000 $x000 $x000 $x000 $x000 $x000

ZOOLOGICAL GARDENS 16,714 16,714

4,179 CT 4,179 CT

12,535 PB 12,535 PB

End

Philadelphia City Planning Commission

Prior Year

1998

1999

2000

2001

2002

2003

1998-2003

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

$ x 000

Timeline

File history

A file can move through several public steps, including introduction, hearings, amendments, votes and final action. This timeline puts those events in date order, groups routine entries from the same day, and attaches published member votes to the action they record.

  1. Member voteCITY COUNCIL

    FAILED

    Member-by-member vote published for this action.

    Fail10 Yes · 7 No · 0 AbsentView member votes →
    Official action detail

    A motion was made that this matter be FAILED. The motion failed by the following vote:

    Member votes

    MemberVote
    Anna Cibotti VernaYes
    Blondell Reynolds BrownNo
    Brian J. O'NeillYes
    Darrell L. ClarkeNo
    David CohenYes
    Donna Reed MillerNo
    Frank J. DiCiccoYes
    Frank RizzoYes
    Jack KellyYes
    James F. KenneyYes
    Jannie L. BlackwellNo
    Joan L. KrajewskiYes
    Juan F. RamosNo
    Marian B. TascoYes
    Michael A. NutterYes
    Rick MarianoNo
    W. Wilson Goode, Jr.No

    Source: LegislationDetail.aspx · gridLegislation

    Council ActionCITY COUNCIL

    RECONSIDERED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

    Council ActionMAYOR

    VETOED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  2. Member voteCITY COUNCIL

    PASSED

    Member-by-member vote published for this action.

    Pass12 Yes · 5 No · 0 AbsentView member votes →
    Official action detail

    A motion was made that this matter be PASSED. The motion carried by the following vote:

    Member votes

    MemberVote
    Anna Cibotti VernaYes
    Blondell Reynolds BrownNo
    Brian J. O'NeillYes
    Darrell L. ClarkeNo
    David CohenNo
    Donna Reed MillerYes
    Frank J. DiCiccoYes
    Frank RizzoYes
    Jack KellyYes
    James F. KenneyYes
    Jannie L. BlackwellNo
    Joan L. KrajewskiYes
    Juan F. RamosYes
    Marian B. TascoYes
    Michael A. NutterYes
    Rick MarianoNo
    W. Wilson Goode, Jr.Yes

    Source: LegislationDetail.aspx · gridLegislation

    Council ActionCITY COUNCIL

    READ

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  3. 3 procedural actionsCITY COUNCIL
    ProceduralCITY COUNCIL

    ORDERED PLACED ON NEXT WEEK`S SECOND READING CALENDAR

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

    UnanimousCITY COUNCIL

    SUSPEND THE RULES OF THE COUNCIL

    Pass
    Official action detail

    A motion was made by Councilmember Blackwell that this matter be SUSPEND THE RULES OF THE COUNCIL. The motion carried unanimously.

    Source: LegislationDetail.aspx · gridLegislation

    ProceduralCITY COUNCIL

    ORDERED PLACED ON THIS DAY`S FIRST READING CALENDAR

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  4. 4 procedural actionsCommittee of the Whole
    ProceduralCommittee of the Whole

    REPORTED FAVORABLY, RULE SUSPENSION REQUESTED

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  5. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  6. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  7. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  8. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  9. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  10. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  11. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  12. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  13. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  14. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  15. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  16. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  17. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  18. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

  19. Council ActionCommittee of the Whole

    RECESSED

    Other recorded action without a published tally.

    Official action detail

    Source: LegislationDetail.aspx · gridLegislation

    2 procedural actionsCommittee of the Whole
  20. UnanimousCITY COUNCIL

    Introduced

    Marked unanimous; no member-by-member tally published.

    Pass
    Official action detail

    A motion was made by Councilmember Blackwell that this matter be Introduced. The motion carried unanimously.

    Source: LegislationDetail.aspx · gridLegislation